William H. Wells: If you''re talking about the smaller rigs, the Rowan acreage the roll over at the end of September. The Rowan Juneau would go all the way to the end of October with an option after that. That''s about the only two would roll over to the next 30 to 60, 90 days. We''re in good shape there, but that''s only two rigs. Both operators have options on them at the end of that.
|