10-K 1 y18280e10vk.htm FORM 10-K 10-K
Table of Contents

 
 
UNITED STATES SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
 
Form 10-K
     
þ
  ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
    For the Fiscal Year ended December 31, 2005.
 
o
  TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
    For the Transition period from           to           .
Commission file No. 001-15891
NRG Energy, Inc.
(Exact name of Registrant as specified in its charter)
     
Delaware   41-1724239
(State or other jurisdiction of
incorporation or organization)
  (I.R.S. Employer
Identification No.)
211 Carnegie Center
Princeton, New Jersey
  08540
(Address of principal executive offices)   (Zip Code)
(609) 524-4500
(Registrant’s telephone number, including area code)
Securities registered pursuant to Section 12(b) of the Act:
     
Title of Each Class   Name of Exchange on Which Registered
     
5.75% Mandatorily Convertible Preferred Stock
  New York Stock Exchange
Securities registered pursuant to Section 12(g) of the Act:
Common Stock, par value $0.01 per share
      Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.     Yes þ          No o
      Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Exchange Act.     Yes o          No þ
      Indicate by check mark whether the Registrant (1) has filed all reports to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports) and (2) has been subject to such filing requirements for the past 90 days.     Yes þ          No o
      Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K (§ 229.405 of this chapter) is not contained herein, and will not be contained, to the best of the Registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.     o
      Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of “accelerated filer and large accelerated filer” in Rule 12b-2 of the Exchange Act.
Large accelerated filer þ          Accelerated filer o          Non-accelerated filer o
      Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).     Yes o          No þ
      As of the last business day of the most recently completed second fiscal quarter, the aggregate market value of the common stock of the registrant held by non-affiliates was approximately $3,272,968,478 based on the closing sale price of $37.60 as reported on the New York Stock Exchange.
      Indicate by check mark whether the registrant has filed all documents and reports required to be filed by Section 12, 13 or 15(d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court.     Yes þ          No o
      Indicate the number of shares outstanding of each of the registrant’s classes of common stock as of the latest practicable date.
     
Class   Outstanding at March 3, 2006
     
Common Stock, par value $0.01 per share
  136,975,275
Documents Incorporated by Reference:
Portions of the Proxy Statement for the 2006 Annual Meeting of Stockholders to be held on April 28, 2006
 
 


 

NRG ENERGY, INC. AND SUBSIDIARIES
INDEX
                       
            Page No.
             
 
                   
Glossary of Terms     2  
           Business     6  
           Risk Factors Related to NRG Energy, Inc.     47  
           Unresolved Staff Comments     60  
           Properties     61  
           Legal Proceedings     64  
           Submission of Matters to a Vote of Security Holders     70  
 PART II     71  
           Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities     71  
           Selected Financial Data     74  
           Management’s Discussion and Analysis of Financial Condition and Results of Operations     76  
           Quantitative and Qualitative Disclosures About Market Risk     124  
           Financial Statements and Supplementary Data     128  
           Changes in and Disagreements with Accountants on Accounting and Financial Disclosures     128  
           Controls and Procedures     128  
           Other Information     128  
 PART III     129  
           Directors and Executive Officers of the Registrant     129  
           Executive Compensation     129  
           Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters     129  
           Certain Relationships and Related Transactions     129  
           Principal Accountant Fees and Services     129  
 PART IV     130  
           Exhibits and Financial Statement Schedules     130  
 SIGNATURES     254  
 EXHIBIT INDEX        
 EX-10.31: AMENDED MASTER POWER PURCHASE AND SALE AGREEMENT
 EX-10.32: TERMS AND CONDITIONS OF SALE
 EX-10.33: EMPLOYMENT AGREEMENT
 EX-10.34: NEO 2005 AIP PAYOUT AND 2006 BASE SALARY TABLE
 EX-21: SUBSIDIARIES OF NRG ENERGY, INC.
 EX-23.1: CONSENT OF KPMG LLP
 EX-23.2: CONSENT OF PRICEWATERHOUSECOOPERS LLP
 EX-31.1: CERTIFICATION
 EX-31.2: CERTIFICATION
 EX-31.3: CERTIFICATION
 EX-32: CERTIFICATION

1


Table of Contents

Glossary of Terms
      When the following terms and abbreviations appear in the text of this report, they have the meanings indicated below:
     
APB
  Accounting Principles Board
APB 18
  APB Opinion No. 18, “The Equity Method of Accounting for Investments in Common Stock.”
Average gross heat rate
  The product of dividing(a) fuel consumed in BTU’s by(b) KWh generated.
BART
  Best Available Retrofit Technology
Baseload capacity
  Electric power generation capacity normally expected to serve loads on an around-=the-clock basis throughout the calendar year.
BTA
  Best Technology Available
BTU
  British Thermal Unit
CAA
  Clean Air Act
CAIR
  Clean Air Interstate Rule
Cal ISO
  California Independent System Operator.
CAMR
  Clean Air Mercury Rule
Capacity factor
  The ratio of the actual net electricity generated to the energy that could have been generated at continuous full-power operation during the year.
CDWR
  California Department of Water Resources
CERCLA
  Comprehensive Environmental Response, Compensation and Liability Act
CL&P
  Connecticut Light & Power
CO 2
  Carbon dioxide
CPUC
  California Public Utilities Commission,
CTDEP
  Connecticut Department of Environmental Protection
CWA
  Clean Water Act
DNREC
  Delaware Department of Natural Resources and Environmental Control
EAF
  The total available hours a unit is available in a year minus the sum of all partial outage events in a year converted to equivalent hours, expressed as a percent of all hours in the year
EFOR
  Equivalent Forced Outage Rates — considers the equivalent impact that forced de-ratings have in addition to full forced outages
EITF
  Emerging Issues Task Force
EITF 91-6
  EITF No. 91-6, “Revenue Recognition of Long-Term Power Sales Contracts.”
EITF 02-3
  EITF Issue No. 02-3, “Issues Involved in Accounting for Derivative Contracts Held for Trading Purposes and Contracts Involved in Energy Trading and Risk Management Activities”
EITF 03-11
  EITF Issue No. 03-11, “Reporting Realized Gains and Losses on Derivative Instruments that are Subject to FASB Statement No. 133 and Not “Held for Trading Purposes” as Defined in EITF Issue No. 02-03.
EPA
  Environmental Protection Agency

2


Table of Contents

     
ERCOT
  Electric Reliability Council of Texas, the Independent System Operator and the regional reliability coordinator of the various electricity systems within Texas
ERISA
  Employee Retirement Income Security Act
Expected annual baseload generation
  The net baseload capacity limited by economic factors (relationship between cost of generation and market price) and reliability factors (scheduled and unplanned outages)
FASB
  Financial Accounting Standards Board, the designated organization for establishing standards for financial accounting and reporting
FERC
  Federal Energy Regulatory Commission
FF-ACI
  Fabric Filter with Activated Carbon Injection
FGD
  Flue Gas Desulphurization
FIN
  Financial Accounting Standards Board Interpretation
FIN 45
  FIN No. 45 “Guarantor’s Accounting and Disclosure Requirements for Guarantees, Including Indirect Guarantees of Indebtedness of Others.”
FIN 46R
  FIN No. 46 (Revised 2003), “Consolidation of Variable Interest Entities”
FIP
  Federal Implementation Plan
Fresh Start
  Reporting requirements as defined by SOP 90-7
FSP
  FASB Staff Position (interpretations of standards issued by the staff of the FASB)
FSP 106-1
  FSP 106-1, “Accounting and Disclosure Requirements Related to the Medicare Prescription Drug, Improvement and Modernization Act of 2003”
FSP 106-2
  FSP 106-2, “Accounting and Disclosure Requirements Related to the Medicare Prescription Drug, Improvement and Modernization Act of 2003”
GHG
  Greenhouse Gases
IGCC
  Integrated Gasification Combined Cycle
IRS
  Internal Revenue Service
ISO
  Independent System Operator, also referred to as regional transmission organizations, or RTO
ISO-NE
  ISO New England, Inc.
KWh
  kilowatt-hours
LADEQ
  Louisiana Department of Environmental Quality
LIBOR
  London Inter-Bank Offered Rate
LNB/OFA
  Low NO x Burner with Over Fire Air
MACT
  Maximum Achievable Control Technology
MADEP
  Massachusetts Department of Environmental Protection
Moody’s
  Moody’s Investors Services, Inc.
MISO
  Midwest Independent Transmission System Operator
MW
  Megawatts
MWh
  Saleable megawatt hours net of internal/parasitic load megawatt-hours
NAAQS
  National Ambient Air Quality Standards
Net baseload capacity
  Nominal summer net megawatt capacity of power generation adjusted for ownership and parasitic load, and excluding capacity from mothballed units as of December 31, 2005

3


Table of Contents

     
Net Capacity Factor
  Net actual generation divided by net maximum capacity for the period hours
Net Generating Capacity
  Nominal summer capacity, net of auxiliary power
NiMo
  Niagara Mohawk Power Corporation
NO x
  Nitrogen oxides
NOL
  Net operating loss
NRC
  United States Nuclear Regulatory Commission
NSR
  New Source Review
NYISO
  New York Independent System Operator.
NYSDEC
  New York Department of Environmental Conservation
OCI
  Other Comprehensive Income
OTC
  Ozone Transport Commission
PJM
  PJM Interconnection, LLC
PJM Market
  The wholesale and retail electric market operated by PJM primarily in all or parts of Delaware, the District of Columbia, Illinois, Maryland, New Jersey, Ohio, Pennsylvania, Virginia and West Virginia.
PM 2.5
  Fine particulate matter
PSD
  Prevention of Significant Deterioration
PUCT
  Public Utility Commission of Texas
Powder River Basin, or PRB Coal
  Coal produced in the northeastern Wyoming and southeastern Montana, which coal has low sulfur content
RCRA
  Resource Conservation and Recovery Act
RECLAIM
  Regional Clean Air Incentives Market
RGGI
  Regional Greenhouse Gas Initiative
RMR
  Reliability must-run
RTC
  RECLAIM Trading Credit
RTO
  Regional transmission organization
S&P
  Standard & Poor’s, a division of the McGraw Hill Companies
SARA
  Superfund Amendments and Reauthorization Act of 1986
Sarbanes-Oxley
  Sarbanes — Oxley Act of 2002
SCAQMD
  South Coast Air Quality Management District
SCR
  Selective Catalytic Reduction
SDG&E
  San Diego Gas & Electric
SEC
  United States Securities and Exchange Commission
SERC
  Southeastern Electric Reliability Council/ Entergy
SFAS
  Statement of Financial Accounting Standards issued by the FASB
SFAS 71
  SFAS No. 71 “Accounting for the Effects of Certain Types of Regulation”
SFAS 87
  SFAS No. 87, “Employers’ Accounting for Pensions”
SFAS 106
  SFAS No. 106, “Employers’ Accounting for Postretirement Benefits Other Than Pensions”
SFAS 109
  SFAS No. 109, “Accounting for Income Taxes”
SFAS 123
  SFAS No. 123, “Accounting for Stock-Based Compensation”
SFAS 123R
  SFAS No. 123 (revised 2004), “Share-Based Payment”
SFAS 133
  SFAS No. 133, “Accounting for Derivative Instruments and Hedging Activities”

4


Table of Contents

     
SFAS 140
  SFAS No. 140, “Accounting for Transfers and Servicing of Financial Assets and Extinguishments of Liabilities, a replacement of FASB Statement 125”
SFAS 142
  SFAS No. 142, “Goodwill and Other Intangible Assets”
SFAS 143
  SFAS No. 143, “Accounting for Asset Retirement Obligations”
SFAS 144
  SFAS No. 144, “Accounting for the Impairment or Disposal of Long-Lived Assets”
SIP
  State Implementation Plan
SO 2
  Sulfur dioxide
SOP
  Statement of Position issued by the American Institute of Certified Public Accountants
SOP 90-7
  Statement of Position 90-7 “Financial Reporting by Entities in Reorganization Under the Bankruptcy Code”
SPP
  Southwest Power Pool
STP
  South Texas Project — Texas Genco’s nuclear generating facility located in Bay City, TX of which we own a 44% interest
TCEQ
  Texas Commission on Environmental Quality
Texas Genco
  Texas Genco LLC
US
  United States of America
USEPA
  US Environmental Protection Agency
US GAAP
  Accounting principles generally accepted in the US
WCP
  WCP (Generation) Holdings, Inc.

5


Table of Contents

PART I
Item 1 — Business
      For purposes of discussing our business in this Business Section of our Annual Report, “we,” “our,” “us,” the “combined company” and the “Company” refer to NRG and Texas Genco on a combined basis, together with their consolidated subsidiaries, after giving effect to the completion of the acquisition of Texas Genco, or the Acquisition. The terms “MW” and “MWh” refer to megawatts and megawatt-hours. The megawatt figures provided represent nominal summer net megawatt capacity of power generated as adjusted for the combined company’s ownership position excluding capacity from inactive/mothballed units as of December 31, 2005. NRG has previously shown gross MWs when presenting its operations. Capacity is tested following standard industry practices. The combined company’s numbers denote saleable MWs net of internal/parasitic load. The term “expected annual baseload generation” refers to the net baseload capacity limited by economic factors (relationship between cost of generation and market price) and reliability factors (scheduled and unplanned outages).
General
      We are a leading wholesale power generation company with a significant presence in many of the major competitive power markets in the United States. We are primarily engaged in the ownership and operation of power generation facilities, purchasing fuel and transportation services to support our power plant operations, and marketing and trading energy, capacity and related products in the competitive markets in which we operate.
      On February 2, 2006, NRG acquired Texas Genco LLC by purchasing all of the outstanding equity interests in Texas Genco. The purchase price of approximately $6.1 billion consisted of approximately $4.4 billion in cash and the issuance of approximately 35.4 million shares of NRG’s common stock valued at approximately $1.7 billion, and we assumed a total of approximately $2.7 billion of Texas Genco’s outstanding debt. The purchase price is subject to adjustment due to acquisition costs. Texas Genco is now a wholly-owned subsidiary of NRG, and will be managed and accounted for as a new business segment to be referred to as NRG Texas.
      As of December 31, 2005, the combined company has a total global portfolio of 235 operating generation units at 61 power generation plants, with an aggregate generation capacity of approximately 24,580 MW. Within the United States, the combined company has a large and geographically diversified power generation portfolio with approximately 22,663 MW of generation capacity in 213 generating units at 53 plants. These power generation facilities are primarily located in our core regions in the ERCOT market (approximately 10,658 MW), and in the Northeast (approximately 7,099 MW), South Central (approximately 2,395 MW) and Western (approximately 1,044 MW) regions of the United States. Our facilities consist primarily of baseload, intermediate and peaking power generation facilities, and also include thermal energy production and energy resource recovery plants. The sale of capacity and power from baseload generation facilities accounts for the majority of our revenues and provides a stable source of cash flow. In addition, our diverse generation portfolio provides us with opportunities to capture additional revenues by selling power into our core regions during periods of peak demand, offering capacity or similar products to retail electric providers and others, and providing ancillary services to support system reliability.
      On December 27, 2005, we entered into a definitive agreement with Dynegy, Inc., to acquire Dynegy’s 50% of WCP. When completed this acquisition will give NRG sole ownership of WCP’s 1,800 MW of generation capacity in California. Our disclosures as to MWs and financial information do not include the remaining 50% interest in WCP.
Our Strategy
      Our strategy is to optimize the value of our generation assets while using that asset base as a platform for enhanced financial performance which can be sustained and expanded upon in years to come. We plan to maintain and enhance our position as a leading wholesale power generation company in the United States in a

6


Table of Contents

cost effective and risk-mitigating manner in order to serve the bulk power requirements of our customer base and other entities that offer load, or otherwise consume wholesale electricity products and services in bulk. Our strategy includes the following elements:
      Increase value from our existing assets. We have a highly diversified portfolio of power generation assets in terms of region, fuel type and dispatch levels. We will continue to focus on extracting value from our portfolio by improving plant performance, reducing costs and harnessing our advantages of scale in the procurement of fuels: a strategy that we have branded “FORNRG,” or Focus on ROIC@NRG.
      Pursue intrinsic growth opportunities at existing sites in our core regions. We are favorably positioned to pursue growth opportunities through expansion of our existing generating capacity. We intend to invest in our existing assets through plant improvements, repowering and brownfield development to meet anticipated regional requirements for new capacity. We expect that these efforts will provide more efficient energy, lower our delivered cost, expand our electricity production capability and improve our ability to dispatch economically across sectors of the merit order, including baseload, intermediate and peaking generation.
      Maintain financial strength and flexibility. We remain focused on increasing cash flow and maintaining liquidity and balance sheet strength in order to ensure continued access to capital for growth; enhancing risk-adjusted returns; and providing flexibility in executing our business strategy. We will continue our focus on maintaining operational and financial controls designed to ensure that our financial position remains strong.
      Reduce the volatility of our cash flows through asset-based commodity hedging activities. We will continue to execute asset-based risk management, hedging, marketing and trading strategies within well-defined risk and liquidity guidelines in order to manage the value of our physical and contractual assets. Our marketing and hedging philosophy is centered on generating stable returns from our portfolio of power generation assets while preserving the ability to capitalize on strong spot market conditions and to capture the extrinsic value of our portfolio. We believe that we can successfully execute this strategy by taking advantage of our expertise in the trading and marketing of power and ancillary services, our knowledge of markets, our flexible financial structure and our diverse portfolio of power generation assets.
      Participate in continued industry consolidation. We will continue to pursue selective acquisitions, joint ventures and divestitures to enhance our asset mix and competitive position in our core regions to meet the fuel and dispatch requirements in these regions. We intend to concentrate on acquisition and joint venture opportunities that present attractive risk-adjusted returns. We will also opportunistically pursue other strategic transactions, including mergers, acquisitions or divestitures during the consolidation of the power generation industry in the United States.
Our Competitive Strengths
      Scale and diversity of assets. The combined company has one of the largest and most diversified power generation portfolios in the United States with approximately 22,663 MW of generation capacity in 213 generating units at 53 plants as of December 31, 2005. Our power generation assets are diversified by fuel type, dispatch level and region, which helps mitigate the risks associated with fuel price volatility and market demand cycles. The combined company’s U.S. baseload facilities consist of approximately 8,558 MW of generation capacity and provide the combined company with a significant source of stable cash flow, while the combined company’s intermediate and peaking facilities, with approximately 14,105 MW of generation capacity, provide the combined company with opportunities to capture the significant upside potential that can arise from time to time during periods of high demand. In addition, approximately 10% of the combined company’s domestic generation facilities have dual or multiple fuel capability, which allows most of these plants to dispatch with the lowest cost fuel option.

7


Table of Contents

      The following chart demonstrates the diversification of the combined company’s generation assets:
(GRAPH)
 
(1)  Reflects only domestic generation capacity; 19 MW of wood-fired generation capacity not shown.
     Stability of future cash flows. We have sold forward a significant amount of our expected baseload generation capacity for 2006 and 2007. As of December 31, 2005 the company has sold forward an average of 77% of its baseload generation in the Texas (ERCOT) market for 2006 through 2009. As of the same date, the combined company sold an average of 78% of its expected annual baseload generation in the SERC — Entergy market for 2006 through 2009, and approximately 76% of its expected annual baseload generation in the Northeast region for 2006. In addition, as of December 31, 2005, the combined company purchased forward under fixed price fuel contracts (with contractually-specified price escalators) to provide fuel for approximately 81% of its expected baseload coal generation output from 2006 to 2009.
      Favorable market dynamics for baseload power plants. As of December 31, 2005, approximately 39% of the company’s domestic generation capacity has been fueled by coal or nuclear fuel. In many of the competitive markets where we operate, the price of power typically is set by the marginal costs of natural gas-fired and oil-fired power plants. These oil and gas fired plants currently have substantially higher variable costs than our solid fuel baseload power plants. As a result of our lower marginal cost for baseload coal and nuclear generation assets, we expect such assets to generate power nearly 100% of the time they are available.
      Locational advantages. Many of our generation assets are located within densely populated areas that are characterized by significant constraints on the transmission of power from generators outside the region. Consequently, these assets are able to benefit from the higher prices that prevail for energy in these markets during periods of transmission constraints. The Company has generation assets located within New York City, southwestern Connecticut, Houston and the Los Angeles and San Diego load basins, all areas with constraints on the transmission of electricity. This allows us to capture additional revenues through offering capacity to retail electric providers and other entities serving load within the transmission constrained areas, selling power at prevailing market prices during periods of peak demand and providing ancillary services in support of system reliability.

8


Table of Contents

Performance Metrics
      The following table contains a summary of NRG’s North American power generation revenues from majority-owned subsidiaries for the year 2005 (figures for our Texas facilities are not included):
                                                 
            Alternative            
    Energy   Capacity   Energy       Other   Total
Region   Revenues   Revenues   Revenues   O&M Fees   Revenues***   Revenues
                         
    (In millions)
Northeast
  $ 1,444     $ 291     $     $     $ (181 )   $ 1,554  
South Central
    330       186                   36       552  
Western*
    1                               1  
Other
    11       5       2             (3 )     15  
                                     
Total North America Power Generation**
  $ 1,786     $ 482     $ 2     $     $ (148 )   $ 2,122  
                                     
 
  Consists of our wholly-owned subsidiary, NEO California LLC. Does not include revenues which were produced by assets in which we have a 50% equity interest, primarily West Coast Power, and are reported under the equity method of accounting.
  **  For additional information — see Item 15 — Note 21 of the Consolidated Financial Statements for our consolidated revenues by segment disclosures.
***  Includes miscellaneous revenues from the sale of natural gas, recovery of incurred costs under reliability must-run agreements, revenues received under leasing arrangements, revenues from maintenance, revenues from the sale of ancillary services and revenues from entering into certain financial transactions, offset by contract amortization.
     In understanding our business, we believe that certain performance metrics are particularly important. These are industry statistics defined by the North American Electric Reliability Council and are more fully described below:
      Annual Equivalent Availability Factor, or EAF: is the total available hours a unit is available in a year minus the sum of all partial outage events in a year converted to equivalent hours (EH), where EH is partial megawatts lost divided by unit net available capacity times hours of each event, and the net of these hours is divided by hours in a year to achieve EAF in percent.
      Average gross heat rate: We calculate the average heat rate for our fossil-fired power plants by dividing (a) fuel consumed in Btus by (b) KWh generated. The resultant heat rate is a measure of fuel efficiency.
      Net Capacity Factor: Net actual generation divided by net maximum capacity for the period hours.
      The tables below present the North American power generation performance metrics for owned assets discussed above for the years ended December 31, 2005 and December 31, 2004 (figures for our Texas facilities are not included):
                                         
    Year Ended December 31, 2005
     
        Annual    
        Net   Equivalent   Average Net    
    Net Owned   Generation   Availability   Heat Rate   Net Capacity
Region   Capacity (MW)   (MWh)   Factor   Btu/KWh   Factor
                     
Northeast*
    7,099       15,251,449       87.2%       11,146       22.9%  
South Central
    2,395       10,116,622       90.9%       10,518       50.6%  
Western**
    1,044       1,588,962       86.5%       11,109       18.0%  
Other North America
    1,467       247,721       90.6%       14,297       3.4%  

9


Table of Contents

                                         
    Year Ended December 31, 2004
     
        Annual    
        Net   Equivalent   Average Net    
    Net Owned   Generation   Availability   Heat Rate   Net Capacity
Region   Capacity (MW)   (MWh)   Factor   Btu/KWh   Factor
                     
Northeast*
    7,099       13,205,040       85.6%       10,823       19.8%  
South Central
    2,395       10,470,786       92.1%       10,494       52.9%  
Western**
    1,044       2,291,844       88.4%       10,624       25.6%  
Other North America***
    1,467       147,376       97.3%       N/A       2.4%  
 
  Net Generation and the other metrics do not include Keystone and Conemaugh.
  **  Includes 50% of the generation owned through our West Coast Power partnership.
***  Excludes operations for Kendall, McClain and Batesville which were sold during 2004.
     The tables below present the Australian power generation performance metrics discussed above for the years ended December 31, 2005 and December 31, 2004:
                                         
    Year Ended December 31, 2005
     
        Annual    
        Net   Equivalent   Average Net    
    Net Owned   Generation   Availability   Heat Rate   Net Capacity
Region   Capacity (MW)   (MWh)   Factor   Btu/KWh   Factor
                     
Flinders Northern Power Station
    480       3,990,642       95.8%       10,900       94.9%  
Flinders Playford Power Station
    220       458,180       57.9%       15,900       23.8%  
Gladstone*
    605       2,808,335       93.3%       10,300       53.0%  
                                         
    Year Ended December 31, 2004
     
        Annual    
        Net   Equivalent   Average Net    
    Net Owned   Generation   Availability   Heat Rate   Net Capacity
Region   Capacity (MW)   (MWh)   Factor   Btu/KWh   Factor
                     
Flinders Northern Power Station
    480       3,924,196       93.2%       11,400       93.1%  
Flinders Playford Power Station
    220       365,642       46.0%       16,300       18.9%  
Gladstone*
    605       2,879,236       83.2%       10,200       54.2%  
 
Includes 37.5% of the generation owned through our Gladstone Unincorporated Joint Venture.

10


Table of Contents

Generation Asset Overview
      We have a significant power generation presence in many of the major competitive power markets of the United States as set out below:
(GRAPH)
     Texas (ERCOT)
      As of December 31, 2005, Texas Genco’s generation assets in the ERCOT market consisted of approximately 5,178 MW of baseload generation assets and approximately 5,480 MW of intermediate, cyclic and peaking natural gas-fired assets. We expect that the combined company will realize a substantial majority of its revenue and cash flow from the sale of power from its three baseload power plants located in the ERCOT market that use solid fuel: W. A. Parish (coal), Limestone (lignite and PRB coal) and an undivided 44% interest in two nuclear generation units at STP (nuclear fuel). Because plants are generally dispatched in order of lowest operating cost, and approximately 73% of the net generation capacity in the ERCOT market was natural gas-fired, we expect these three baseload plants to operate nearly 100% of the time (subject to planned and forced outages) due to their low marginal costs relative to natural gas-fired plants.
      The following table summarizes the ERCOT baseload forward power sales and natural gas swap agreements that extend beyond December 31, 2005. The amounts summarized below reflect forward sales volumes and average prices as of December 31, 2005:
                                                         
                        Annual   Annual
                        Average for   Average for
    2006   2007   2008   2009   2010   2006-2007   2006-2010
                             
Net Baseload Capacity (MW)
    5,294       5,340       5,340       5,340       5,340       5,317       5,331  
Total Baseload Sales (MW)(1)
    4,375       4,267       4,157       3,449       1,395       4,321       3,529  
Percentage Baseload Capacity Sold Forward
    83 %     80 %     78 %     65 %     26 %     81 %     66 %
Weighted Average Forward Price ($ per MWh)(2)
  $ 44     $ 39     $ 41     $ 47     $ 51     $ 41     $ 43  
Total Revenues Sold Forward ($ in millions)(2)
  $ 1,690     $ 1,443     $ 1,505     $ 1,434     $ 621     $ 1,566     $ 1,338  
 
(1)  Includes amounts under fixed price firm and non-firm power sales contracts and amounts financially hedged under natural gas swap contracts. The forward natural gas swap quantities are reflected in equivalent MW and are derived by first dividing the quantity of MMBtu of natural gas hedged by the forward market heat rate (in MMBtu/ MWh, mid-point of the bid and offer as quoted by

11


Table of Contents

brokers in the market of the relevant Electric Reliability Council of Texas zones as of December 30, 2005) to arrive at the equivalent MWh hedged which is then divided by 8,760 to arrive at MW hedged.

(2)  Includes amounts under fixed price power sales contracts and amounts financially hedged under natural gas swap contracts.
Northeast
      As of December 31, 2005, approximately 7,099 MW of NRG’s generation capacity consisted of power plants in the Northeast region of the United States, including power plants within the control areas of the New York Independent System Operator, or NYISO, the ISO-New England, Inc., or ISO-NE, and the PJM Interconnection LLC., or PJM. Certain of these assets are located in transmission constrained areas, including approximately 1,394 MW of in-city New York City generation capacity and approximately 538 MW of southwest Connecticut generation capacity. As of December 31, 2005, NRG’s generation assets in the Northeast region consisted of approximately 1,876 MW of baseload generation assets and approximately 5,223 MW of intermediate and peaking assets.
      The following table summarizes Northeast’s baseload forward power sales that extend beyond December 31, 2005. The amounts summarized below reflect forward sales volumes and average prices as of December 31, 2005:
                                                 
                        Annual
                        Average for
    2006   2007   2008   2009   2010   2006-2007
                         
Net Baseload Capacity (MW)
    1,876       1,876       1,876       1,876       1,876       1,876  
Total Baseload Sales (MW)
    1,410       608                         1,009  
Percentage Baseload Capacity Sold Forward
    75 %     32 %     %     %     %     54 %
Weighted Average Forward Price ($ per MWh)
  $ 72     $ 76     $     $     $     $ 74  
Total Revenues Sold Forward ($ in millions)
  $ 885     $ 406     $     $     $     $ 645  
South Central
      As of December 31, 2005, NRG owned approximately 2,395 MW of generation capacity in the South Central region of the United States, making NRG the third largest generator in the Southeastern Electric Reliability Council/ Entergy, or SERC-Entergy, region. NRG’s generation assets in the South Central region consisted of approximately 1,489 MW of baseload generation assets and 906 MW of intermediate and peaking assets. NRG’s primary asset is the Big Cajun II coal-fired plant near Baton Rouge, where NRG has approximately 1,489 MW of generation capacity.
      The following table summarizes South Central’s baseload forward power sales that extend beyond December 31, 2005. The amounts summarized below reflect forward sales volumes and average prices as of December 31, 2005:
                                                         
                        Annual   Annual
                        Average for   Average for
    2006   2007   2008   2009   2010   2006-2007   2006-2010
                             
Net Baseload Capacity (MW)
    1,489       1,489       1,489       1,489       1,489       1,489       1,489  
Total Baseload Sales (MW)(1)
    1,150       1,097       1,088       1,015       1,008       1,124       1,072  
Percentage Baseload Capacity Sold Forward
    77 %     74 %     73 %     68 %     68 %     75 %     72 %
Weighted Average Forward Price ($ per MWh)
  $ 33     $ 32     $ 33     $ 34     $ 36     $ 33     $ 34  
Total Revenues Sold Forward ($ in millions)
  $ 307     $ 308     $ 314     $ 303     $ 316     $ 307     $ 310  
 
(1)  Total Baseload Sales volumes for South Central are estimated volumes using historical load information.
Western
      As of December 31, 2005, NRG’s assets in the Western Electricity Coordinating Council, or WECC, the power market for the West Coast of the United States, included approximately 1,044 MW of generation

12


Table of Contents

capacity, most of it in NRG’s 50% interest in WCP Holdings. NRG’s generation assets in the Western region consisted of approximately 1,044 MW of intermediate and peaking assets. As part of NRG’s strategy of optimizing NRG’s asset base, NRG retired approximately 265 MW of additional gross generation capacity at the Long Beach generating facility on January 1, 2005. On December 27, 2005, NRG entered into a purchase and sale agreement to acquire Dynegy’s 50% ownership interest in WCP Holdings to become the sole owner of power plants totaling approximately 1,800 MW of generation capacity in the Western region. On March 1, 2006, FERC issued an order authorizing the transaction, pursuant to section 203 of the Federal Power Act.
Australia
      As of December 31, 2005, NRG owned approximately 1,305 MW of coal fired, primarily base load generation plants in the Australian National Electricity Market (NEM) — 700 MW in the South Australian region (NRG Flinders) and 605 MW in the Queensland Region (Gladstone). NRG Flinders is a merchant generation business that derives revenue from bidding its output into the NEM, by trading the plant as a portfolio, selling derivative hedges that are not plant specific and supplying minor retail sales via contract. 180 MW of gas fired power contracted from Osborne under a long-term PPA is also traded as part of the portfolio. A hedge book is maintained such that the short to medium term revenue is secured via hedge levels up to and in the order of 75-80% of the plant output. The current book is underpinned by a medium term hedge with a major South Australian retailer. The Gladstone assets are owned through an unincorporated joint venture with other investors and NRG does not have unilateral control over management of the assets. Gladstone Power Station is fully contracted through 2029 via a PPA and a capacity purchase agreement with Boyne Smelter Limited and Enertrade, respectively. Enertrade is a state owned company that trades the excess power in the NEM.
Other
      As of December 31, 2005, NRG had net ownership in approximately 1,467 MW of additional generating capacity in the United States. In addition to these traditional power generation facilities, NRG also owns thermal and chilled water businesses that generate approximately 1,225 MW thermal equivalents, as well as resource recovery facilities, as described below. NRG also owns interests in power plants having a generation capacity of approximately 611 MW from a hydro plant in Brazil and coal plants adjacent to our coal mines in Germany.
Power Marketing and Commercial Operations
      We seek to maximize profitability and manage cash flow volatility through the marketing, trading and sale of energy, capacity and ancillary services into spot, intermediate and long-term markets and through the active management and trading of emissions credits, fuel supplies and transportation-related services. Our principal objectives are the realization of the full market value of our asset base, including the capture of extrinsic value, the management and mitigation of commodity market risk, and the reduction of cash flow volatility over time.
      We enter into power sales and hedging arrangements via a wide range of products and contracts, including power purchase agreements, fuel supply contracts, capacity auctions, natural gas swap agreements and other financial instruments. The power purchase agreements we enter into require us to deliver MWh of power to our counterparties. Natural gas swap agreements and other financial instruments hedge the price we will receive for power to be delivered in the future.
      Before NRG acquired it, Texas Genco’s capital structure permitted the grant of second priority liens on its assets as security for Texas Genco’s obligations under certain long-term power sales agreements and related hedges. The Credit Agreement for NRG’s senior secured debt and the Indentures for NRG’s high yield notes, which became effective as of February 2, 2006, allow these arrangements to remain in place. In addition, the new debt instruments also permit us to grant second priority liens on our other assets in the United States in order to secure obligations under power sales agreements and related hedges, within certain limits. The seven trading counterparties of Texas Genco who held second priority liens on Texas Genco’s assets as of

13


Table of Contents

February 2, 2006, have been offered a second priority lien on NRG’s other assets under the new structure, as additional collateral. Going forward, NRG anticipates that it will use the second lien structure to reduce the amount of cash collateral and letters of credit that it may otherwise be required to post from time to time to support its obligations under long term power sales and related hedges.
      As of February 28, 2006, our net mark-to-market exposure on the hedges that are subject to the second lien structure was $1.9 billion. The following table summarizes the utilization of the second lien structure as of December 31, 2005:
                                           
    12 Months Starting
     
    Jan 1,   Jan 1,   Jan 1,   Jan 1,   Jan 1,
    2006   2007   2008   2009   2010
                     
Equivalent Net Sales secured by Second Lien Structure(1)
                                       
 
In MWh
    2,081       3,067       2,513       2,999       1,395  
 
As a percentage of net baseload capacity in collateral pool as of February 2, 2006
    30 %     44 %     36 %     43 %     20 %
 
(1)  Equivalent Net Sales include natural gas swaps converted using a weighted average heat rate by region.
     Our largest customer under the second lien structure is J. Aron & Co., or J. Aron. The agreements with J. Aron extend through December 31, 2010, and account for approximately 26% of NRG’s baseload generation in Texas and approximately 16% of our total baseload capacity, as measured in MWh through 2010.
      In addition to the second lien described above, NRG also provides cash collateral and letters of credit to secure its obligations under hedge agreements and other power marketing contracts. As of December 31, 2005, the combined company, after giving effect to the Acquisition, had posted cash collateral (including letters of credit) to support commercial operations totaling $1.2 billion. The following table summarizes, as of December 31, 2005, the combined company collateral posted by credit rating.
                         
    Letters of       Collateral
Credit Rating   Credit   Cash   Posted
             
    (In millions)
A– and above
  $ 616     $ 392     $ 1,008  
BBB– through BBB+
    99       39       138  
Below BBB-
    7       4       11  
Not Rated(1)
    38       3       41  
                   
Total
  $ 760     $ 438     $ 1,198  
                   
 
(1)  Not Rated indicates that no rating has been issued, or that an external rating agency (for example, Standard & Poor’s or Moody’s) does not rate a particular obligation as a matter of policy. The Not Rated row above consists of collateral posted to 17 counterparties, mainly gas producers.
Fuel Supply and Transportation
      Our fuel requirements consist primarily of nuclear fuel and various forms of fossil fuel including oil, natural gas and coal (including lignite). We obtain our oil, natural gas and coal from multiple sources. Although fossil fuels are generally available for purchase, localized shortages, transportation availability and supplier financial stability issues can and do occur. The prices of oil, natural gas and coal are subject to macro-and micro-economic forces that can change dramatically in both the short-term and the long-term. We are largely hedged for our domestic coal consumption over the next few years.
      We arrange for the purchase, transportation and delivery of coal for our coal plants via a range of coal purchase agreements, rail and barge transportation agreements and rail car lease arrangements. Coal consumption in 2006 for NRG is expected to be approximately 36 million tons, which would rank us as one of

14


Table of Contents

the top five coal purchasers in the United States. In addition, approximately 92% of our coal-fired generation benefits from multiple sourcing and transportation alternatives. The Company has approximately 6,100 privately leased or owned rail cars in its transportation fleet. In addition, we intend to enter into contracts for delivery of approximately 2,700 additional rail cars within the next two years of which approximately 2,200 will replace existing rail cars. NRG has entered into rail transportation agreements that provide for substantially all of its rail transportation requirements through 2009.
      STP satisfies its fuel supply requirements by acquiring uranium concentrates and contracting for conversion of the uranium concentrates into uranium hexafluoride, for enrichment of uranium hexafluoride and for fabrication of nuclear fuel assemblies. Through our subsidiary Texas Genco, we are party to a number of contracts covering a portion of the fuel requirements of STP for uranium, conversion and enrichment services and fuel fabrication. The table below summarizes the nuclear fuel situation at STP through the major processes:
             
    Process   Supplier(s)   Procurement Status
             
Step 1
  Yellow cake U(3)O(8). Conversion to uranium hexafluoride (UF(6))   Contracts with Cameco (Canada) and Cogema/Arriba (France) combine these steps.   100% covered through mid-2011 and then 25% covered through 2021.
Step 2
  Enrichment of U235 content   Urenco (Germany), Cogema/ Arriba (France), Louisiana Enrichment Services, or LES (1) (joint venture between Westinghouse & Urenco).   Urenco and Cogema contracts cover through mid-2008. Contract with Urenco/LES through 2027/2028.
Step 3
  Fabrication of fuel rods   Westinghouse.   Contract covers life of operating license.
 
(1)  Enrichment by LES assumes successful completion of LES licensing and construction of facility in New Mexico.
Financial Information About Segments and Geographic Areas
      For financial information on NRG’s operations on a geographical and on a segment basis, see Item 15 — Note 21 to the Consolidated Financial Statements.
Dispositions of Non-Strategic Assets
      We continued to market our interest in our remaining non-core assets during 2005. Since 2003, we sold or made arrangements to sell a number of consolidated businesses and equity investments in an effort to reduce our debt, improve liquidity and rationalize our investments. Dispositions completed during 2005 are summarized in the following chart:
                                                   
            Closing       Gain/(Loss)   Debt
Asset (Location)   Type   Segment   Date   Proceeds   on Disposition   Reduction
                         
                (In millions)
Enfield, England
    Equity investment       Other International       4/1/2005     $ 65     $ 12     $  
Kendall, IL
    Equity investment       Other North America       8/8/2005       5       4        
Northbrook New York, NY and Northbrook Energy (Multi- state)
    Discontinued operation       Other North America       8/11/2005       36       12       44  
Bourbonnais, IL
    Land sale       Other North America       8/31/2005       2              
Kaufman, TX
    Land sale       Other North America       12/22/2005       5       4        
                                     
 
Total
                          $ 113     $ 32     $ 44  
                                     

15


Table of Contents

Reorganization
      We were formed in 1992 as the non-utility subsidiary of Northern States Power Company, or NSP, which was itself merged into New Century Energies, Inc. to form Xcel Energy, Inc., or Xcel Energy, in 2000. In 2002, a number of factors including the overall downturn in the power generation industry, triggered a series of credit rating downgrades which, in turn, precipitated a severe liquidity crisis at the Company. From May 14 to December 23, 2003, we and a number of our subsidiaries undertook a comprehensive reorganization and restructuring under chapter 11 of the United States Bankruptcy Code. All NRG entities have emerged from chapter 11 as of December 31, 2005. As part of our reorganization, Xcel Energy relinquished its ownership interest in us, and we became an independent public company. We no longer have any material affiliation or relationship with Xcel Energy.
Fresh Start Reporting
      As a result of our emergence from bankruptcy, we adopted Fresh Start Reporting, or Fresh Start. Under Fresh Start, our confirmed enterprise value was allocated to our assets and liabilities based on their respective fair values. See Item 7 — Management’s Discussion and Analysis of Financial Condition and Results of Operation — Reorganization and Emergence from Bankruptcy for additional information. 2004 was our first complete year following the adoption of Fresh Start.
Significant Customers
Reorganized NRG (excluding Texas Genco)
      For the year ended December 31, 2005 we derived approximately 50.2% of total revenues for majority owned operations from two customers: NYISO accounted for 35.6% and ISO-NE accounted for 14.6%. We account for the revenues attributable to these customers as part of our Northeast segment.
      For the year ended December 31, 2004, we derived approximately 37.8% of our total revenues from majority-owned operations from two customers. NYISO accounted for 28.6% and ISO New England accounted for 9.2%. We account for these revenues attributable to NYISO and ISO New England as part of our Northeast segment.
      For the period December 6, 2003 through December 31, 2003, we derived approximately 39.4% of our total revenues from majority-owned operations from two customers: NYISO accounted for 26.8% and ISO New England accounted for 12.6%. Revenues from NYISO and ISO New England are included in our Northeast segment.
Predecessor Company
      For the period from January 1, 2003 through December 5, 2003, sales to one customer, NYISO, accounted for 33.4% of our total revenues from majority-owned operations.
Seasonality and Price Volatility
      Annual and quarterly operating results can be significantly affected by weather and energy commodity price volatility. Significant other events, such as the demand for natural gas, interruptions in fuel supply infrastructure and relative levels of hydroelectric capacity can increase seasonal fuel and power price volatility. We derive a majority of our annual revenues in the months of May through September, when demand for electricity is the highest in our North American markets. Further, power price volatility is generally higher in the summer months due to the effect of temperature variations. Our second most important season is winter when volatility and price spikes in underlying fuel prices have tended to drive seasonal electricity prices. Issues related to seasonality and price volatility are fairly uniform across our business segments.

16


Table of Contents

Sources and Availability of Raw Materials
      Our raw material requirements primarily include various forms of fossil fuel, including oil, natural gas and coal. We obtain our oil, natural gas and coal from multiple suppliers and transportation sources and availability is generally not an issue, although localized shortages, transportation availability and supplier financial stability issues can and do occur. The prices of oil, natural gas and coal are subject to macro- and micro-economic forces that can change dramatically in both the short-term and the long-term. For example, the price of natural gas was particularly volatile in late 2005 due to infrastructure damage caused by Hurricanes Katrina and Rita. Additionally, throughout 2005, oil prices were extremely volatile due to hurricane damage, geo-political uncertainty in the Middle East and increased global oil demand. Issues related to the sources and availability of raw materials are fairly uniform across our business segments.
Plant Operations
      We provide overall support services to our generation facilities to ensure that high-level performance goals are developed, best practices are shared and resources are appropriately balanced and allocated to get the best results for us. Performance goals are set for equivalent forced outage rates, or EFOR, availability, procurement costs, operating costs and safety.
      The functional areas included in this organization include safety and security, engineering, project management, construction services, and purchasing. These services also include overall facilities management, operations strategic planning and the development and dissemination of consistent policies and practices relating to plant operations.
Environmental Controls
      Between 2002 and 2007, NRG has made, and will continue to make, investments that we believe will total approximately $125 million in its coal-fired plants in the Northeast region of the United States so that they can burn low sulfur coal from the Powder River Basin in Wyoming and Montana. These improvements have not only led to significant reductions in sulfur dioxide emissions, but have also improved the operational flexibility and financial performance of these plants. During the same period, NRG expects to invest approximately $32 million in its coal plants in the South Central region for NOx burners and over fired air, which have led to reductions in NOx. A significant portion of this investment may be recovered from NRG’s cooperative customers. Texas Genco and its predecessors invested over $700 million in NOx reduction initiatives since 1999 to ensure both regulatory compliance and continued performance, and we estimate we will invest approximately $70 million in additional capital expenditures in these assets to meet pollution control requirements from 2006 to 2014.

17


Table of Contents

      The following table summarizes the key existing and current forecasted plans as to environmental controls on our coal-fired units. Also see our discussion on Environmental Matters further within this Business Section:
                                                                 
    SO2   NOx   Hg   Particulate
                 
    Control   Install   Control   Install   Control   Install   Control   Install
Units   Equipment   Date   Equipment   Date   Equipment   Date   Equipment   Date
                                 
Huntley 67
    Wet FGD(1)       2013       SNCR       2010       FF-ACI(2)       2011       ESP       1973  
Huntley 68
    Wet FGD(1)       2013       SNCR       2011       FF-ACI(2)       2009       ESP       1973  
Dunkirk 1
    None             SNCR       2010       FF-ACI(2)       2010       ESP       1974  
Dunkirk 2
    None             SNCR       2011       FF-ACI(2)       2011       ESP       1974  
Dunkirk 3
    None             SNCR       2010       FF-ACI(2)       2011       ESP       1975  
Dunkirk 4
    None             SNCR       2011       FF-ACI(2)       2010       ESP       1976  
Indian River 1
    In-Duct Scrubber       2012       SNCR & LNB (3)       2008       Co-Benefit of Scrubbers       2012       ESP (IR1-3)       1976  
Indian River 2
    In-Duct Scrubber       2013       SNCR & LNB (3)       2008       Co-Benefit of Scrubbers       2013       ESP (IR1-3)       1976  
Indian River 3
    In-Duct Scrubber       2012       LNB(3) & SNCR       2008       Co-Benefit of Scrubbers       2012       ESP (IR1-3)       1980  
                      upgrade                                          
Indian River 4
    Dry Scrubber       2011       LNB(3) & SNCR       2008       Co-Benefit of Scrubbers       2011       ESP (IR1-3)       1980  
                      upgrade                                          
Big Cajun II 1
    Dry Scrubber       2011       None               ACI(2)       2012       ESP       1981  
Big Cajun II 2
    Dry Scrubber       2010       SCR(4)       2010       ACI(2)       2011       ESP       1981  
Big Cajun II 3
    Dry Scrubber       2013       SCR(4)       2013       ACI(2)       2014       ESP       1983  
Limestone
    FGD       1986-87       LNB/OFA(3)       2000-01       Co-Benefit of Scrubbers             ESP       1986-87  
WA Parish 5,6,7
    None       NA       SCR & LNB/OFA (3)       2000-04       None             FF       1988  
WA Parish 8
    FGD       1982       SCR & LNB/OFA (3)       2000-04       Co-Benefit of Scrubber             FF       1988  
 
(1)  FGD stands for Flue Gas Desulfurization
 
(2)  FF-ACI stands for Fabric Filter with Activated Carbon Injection
 
(3)  LNB/ OFA stands for Low NOx Burner with Over Fire Air
 
(4)  SCR stands for Selective Catalytic Reduction
Performance Improvement and Cost and Process Control Initiatives
      In May 2005, NRG announced FORNRG, a comprehensive cost and margin improvement program, consisting of a large number of asset, portfolio and headquarters-specific targeted initiatives. This effort has been branded as “FORNRG,” or Focus on ROIC@NRG. Projects are focused on improving plant performance, reducing purchasing and other costs and streamlining processes. A large number of initiatives are currently underway in plant operations including forced outage reductions and heat rate improvements at NRG’s major base load facilities. Additional initiatives are underway at our regional and headquarter offices as well. The ultimate objective is to produce $100 million of recurring benefits by 2008.
      There have been a number of parallel improvement programs underway at Texas Genco, which have focused on streamlining processes, right sizing the organization and running efficient operations. As part of the integration of Texas Genco into NRG, we are comparing best practices and results between NRG and Texas Genco, and we are combining purchasing programs and incorporating Texas Genco processes under the FORNRG program.
Regional Business Descriptions
      The combined company is organized into business units as described below, with each of our core regions operating as a separate unit.
TEXAS (ERCOT)
      NRG’s largest business unit is located in the Texas (ERCOT) region of the United States and is comprised of investments in generation facilities located in the physical control areas of the ERCOT-ISO. These assets were acquired on February 2, 2006 as part of the Texas Genco Acquisition.

18


Table of Contents

Operating Strategy
      Our business in the ERCOT region is comprised of two fundamental sets of assets: a regionally diverse set of three large solid-fuel baseload plants and a set of generally older gas-fired plants located in and around Houston. Our operating strategy to maximize value and opportunity across these two sets of assets is four pronged: (1) to ensure the availability of the baseload plants to fulfill their commercial obligations under long-term forward sales contracts already in place, (2) to manage the gas assets for profitability while ensuring the reliability and flexibility of power supply to the Houston market, (3) to take advantage of our skill sets and market/regulatory knowledge to grow the business through incremental capacity uprates and brownfield development of solid-fuel baseload units and (4) to play a leading role in the development of the ERCOT market by active membership and participation in market and regulatory issues.
      It is our strategy to sell forward up to 80% of our solid-fuel baseload capacity in ERCOT under long-term contracts. Accordingly, our primary focus will be to keep these solid-fuel baseload units running efficiently. The generation performance by fuel type for the recent three-year period is as shown below:
                           
    Net Generation (MWh)
     
    2005   2004   2003
             
    (In thousands)
Coal
    31,299       31,222       29,754  
Gas
    6,806       7,701       10,701  
Nuclear
    6,412       6,580       4,843  
                   
 
Total
    44,517       45,503       45,298  
                   
      On the gas-fired asset side, we will continue a dual path of contracting forward a significant portion of gas-fired capacity one to two years out while holding a portion for back-up in case there is an operational issue with one of the baseload units. For the gas-fired capacity sold forward, we offer a range of products including “virtual units” where the customer has the right to dispatch capacity as the customer needs in order to meet their physical load requirements. For the gas-fired capacity that we will continue to sell commercially into the market, we will focus on making this capacity available to the market whenever it is economic to run.
      Texas Genco’s growth efforts to date have been focused on adding incremental capacity to existing units — such as the 99 MW uprate at Limestone 2 in the spring of 2006. We will continue this effort with exploration of some additional potential opportunities at W. A. Parish as well as some scheduled uprates at STP. We have also launched a broader brownfield development initiative where we will evaluate opportunities to take advantage of our current power plant sites and other land we own as well as our deep market, regulatory, and environmental knowledge to consider the development of new solid fuel baseload units.

19


Table of Contents

Facilities
      The following table describes Texas Genco’s electric power generation plants and generation capacity as of December 31, 2005:
                                 
            Net Generation    
            Capacity    
Generation Sites   Location   % Owned   (MW)(1)   Primary Fuel Type(2)
                 
Solid Fuel Baseload Units:
                               
W. A. Parish(3)
    Thompsons, TX       100 %     2,463     Low Sulfur Coal Lignite/Low Sulfur
Limestone
    Jewett, TX       100 %     1,614       Coal  
South Texas Project(4)
    Bay City, TX       44 %     1,101       Nuclear  
                         
Total Solid Fuel Baseload
                    5,178          
Operating Natural Gas-Fired Units:
                               
Cedar Bayou
    Chambers County, TX       100 %     1,498       Natural Gas  
T. H. Wharton
    Houston, TX       100 %     1,025       Natural Gas  
W. A. Parish (Natural gas)(3)
    Thompsons, TX       100 %     1,191       Natural Gas  
S. R. Bertron
    Deer Park, TX       100 %     844       Natural Gas  
Greens Bayou
    Houston, TX       100 %     760       Natural Gas  
San Jacinto
    LaPorte, TX       100 %     162       Natural Gas  
                         
Total Operating Natural Gas-Fired
                    5,480          
                         
Total Texas (ERCOT) Region
                    10,658          
                         
 
(1)  Actual capacity can vary depending on factors including weather conditions, operational conditions and other factors. ERCOT requires periodic demonstration of capability, and the capacity may vary individually and in the aggregate from time to time. Excludes 3,378 MW of inactive capacity available for redevelopment of which 174 MW of available capacity was sold on November 14, 2005. An additional 461 MW was moved to inactive status as of December 31, 2005.
 
(2)  Low sulfur coal is coal mined from the Powder River Basin, a coal-producing area in northeastern Wyoming and southeastern Montana, which coal has low sulfur content relative to most coal from the eastern United States.
 
(3)  W. A. Parish has nine units, four of which are baseload coal-fired units and five of which are natural gas-fired units.
 
(4)  Generation capacity figure consists of our 44.0% undivided interest in the two units of STP.
     W.A. Parish. The W. A. Parish plant is one of the largest fossil-fired plants in the United States based on total MWs of generation capacity. The plant is located in the Houston ERCOT zone and was recognized by Platts’ Power Magazine as one of the top power plants in the United States for 2004. This plant’s power generation units include four coal-fired steam generation units with an aggregate generation capacity of 2,463 MW as of December 31, 2005. Two of these units are 649 MW steam units that were placed in commercial service in December 1977 and December 1978, respectively. The other two units are 555 MW and 610 MW steam units that were placed in commercial service in June 1980 and December 1982, respectively. All four units are serviced by two competing railroads that diversify Texas Genco’s coal transportation options at competitive prices. Texas Genco invested approximately $430 million in nitrogen oxide, or NOx, control systems from 1999 to 2004. Each of the four coal-fired units has low- NOx burners and selective catalytic reduction, or SCR, installed to reduce NOx emissions. In addition, W. A. Parish Unit 8 has a scrubber installed to reduce sulfur dioxide, or SO2, emissions. Plant efficiency projects to be completed by year end 2007 are expected to uprate the net generation capacity of W.A. Parish by 31 MW.
      Limestone. The Limestone plant is a lignite and coal-fired plant located approximately 140 miles northwest of Houston. This plant includes two steam generation units with an aggregate generation capacity of 1,614 MW as of December 31, 2005. The first unit is an 836 MW steam unit that was placed in commercial service in December 1985. The second unit is a 778 MW steam unit that was placed in commercial service in December 1986. Limestone primarily burns lignite from an on-site mine, but also burns low sulfur coal and petroleum coke. This serves to lower average fuel costs by eliminating fuel transportation costs, which can

20


Table of Contents

represent up to two-thirds of delivered fuel costs for plants of this type. We own the mining equipment and facilities and a portion of the lignite reserves located at the mine. Mining operations are conducted by Texas Westmoreland Coal Co., a single purpose, wholly-owned subsidiary of Westmoreland Coal Company and the owner of a substantial portion of the remaining lignite reserves. Both units have installed low- NOx burners to reduce NOx emissions and scrubbers to reduce SO2 emissions. In the second quarter of 2006 we plan to replace the high pressure and intermediate pressure turbines at Limestone Unit 2, rewinding the generator and replacing the main generator step-up transformer. This work is expected to cost approximately $33 million and to improve generation capacity by 99 MW.
      South Texas Project Electric Generating Station. STP is one of the newest and largest nuclear-powered generation plants in the United States based on total megawatts of generation capacity. This plant is located approximately 90 miles south of downtown Houston, near Bay City, Texas and consists of two generation units each representing approximately 1,250 MW of generation capacity. Plant efficiency projects to be completed by 2007 are expected to uprate the net generation capacity of STP by 73 MW (32 MW net to NRG). STP’s two generation units commenced operations in August 1988 and June 1989, respectively. For the year ended December 31, 2004, STP had a forced outage rate of 0.4% and a 97% capacity factor.
      STP is currently owned as a tenancy in common among NRG and two other co-owners. NRG owns a 44.0% (1,101 MW) interest in STP, the City of San Antonio owns a 40% interest and the City of Austin owns the remaining 16% interest. Each co-owner retains its undivided ownership interest in the two nuclear-fueled generation units and the electrical output from those units. In the event any owner desires to sell all or part of its ownership interest in STP, such sale is subject to a right of first refusal in favor of the other owners. Except for certain plant shutdown and decommissioning costs and NRC licensing liabilities, NRG is severally liable, but not jointly liable, for the expenses and liabilities of STP. The original co-owners of STP organized South Texas Project Nuclear Operating Company, or STPNOC, to operate and maintain STP. STPNOC is managed by a board of directors composed of one director appointed by each of the three co-owners, along with the chief executive officer of STPNOC. STPNOC is the NRC-licensed operator of STP. No single owner controls STPNOC and all decisions must be approved by two or more owners who collectively control more than 60% of the interests. Due to the fact that NRG owns 44% of STP, NRG effectively holds a veto right.
      In connection with the acquisition by Texas Genco of 13.2% of STP from AEP, Texas Genco, LP agreed with AEP that, for a period of ten years from May 19, 2005, Texas Genco, LP would maintain a minimum partners’ equity, determined in accordance with GAAP, of $300 million. This obligation remains in effect as an obligation of NRG.
      The two STP generation units operate under licenses granted by the NRC that expire in 2027 and 2028, respectively. These licenses may be extended for additional 20-year terms if the project satisfies NRC requirements. Adequate provisions exist for long-term on-site storage of spent nuclear fuel throughout the remaining life of the existing STP plant licenses.
Market Framework
      The ERCOT market is one of the nation’s largest and fastest growing power markets. It represents approximately 85% of the demand for power in Texas and covers the whole state, with the exception of the far west (El Paso), a large part of the Texas Panhandle and two small areas in the eastern part of the state. From 1994 through 2004, peak hourly demand in the ERCOT market grew at a compound annual rate of 3.0%, compared to a compound annual rate of growth of 2.1% in the United States for the same period. For 2004, hourly demand ranged from a low of 20,276 MW to a high of 58,506 MW. ERCOT has limited interconnections — currently limited to 856 MW of generation capacity — to other markets in the United States, and wholesale transactions within ERCOT are not subject to regulation by FERC. Any wholesale producer of power that qualifies as a power generation company under the Texas electric restructuring law and that can access the ERCOT electric power grid is allowed to sell power in the ERCOT market at unregulated rates.
      The ERCOT market has experienced significant construction of new generation plants in recent years, with over 20,000 MW of mostly natural gas-fired combined cycle generation capacity added to the market

21


Table of Contents

since 2000. As of December 31, 2005, aggregate net generation capacity of approximately 81,000 MW existed in the ERCOT market, of which 73% was natural gas-fired. Approximately 20,000 MW, or 25%, was lower marginal cost generation capacity such as coal, lignite and nuclear plants. NRG’s coal and nuclear fuel baseload plants represent approximately 5,178 MW, or 26%, of the total solid fuel baseload net generation capacity in the ERCOT market. ERCOT has established a target equilibrium reserve margin level of approximately 12.5%; the reserve margin as of the latest known information on December 31, 2005 was 16.9%. Construction of new generation plants has been minimal since 2004, and we expect that reserve margins will decrease as demand gradually grows and surpasses recently added supply.
      In the ERCOT market, buyers and sellers enter into bilateral wholesale capacity, power and ancillary services contracts or may participate in the centralized ancillary services market, including balancing energy, which ERCOT administers. In the ERCOT market, a 2004 report by Henwood found that natural gas-fired plants have set the market price of wholesale power more than 90% of the time. As a result, NRG’s lower marginal cost solid-fuel baseload plants are expected to generate power nearly 100% of the time they are available.
      The ERCOT market is divided into five regions or congestion zones (Northeast, North, Houston, South and West), which reflect transmission constraints that limit the amount of power that can flow across zones. NRG’s W. A. Parish plant and all its natural gas-fired plants are located in the Houston zone, NRG’s Limestone plant is located in the North zone and STP is located in the South zone.
      The ERCOT market operates under the reliability standards set by the North American Electric Reliability Council, or NERC. The PUCT has primary jurisdiction over the ERCOT market to ensure the adequacy and reliability of power supply across Texas’ main interconnected power transmission grid. ERCOT is responsible for facilitating reliable operations of the bulk electric power supply system in the ERCOT market. Its responsibilities include ensuring that power production and delivery are accurately accounted for among the generation resources and wholesale buyers and sellers. Unlike power pools with independent operators in other regions of the country, the ERCOT market is not a centrally dispatched power pool and ERCOT does not procure power on behalf of its members other than to maintain the reliable operations of the transmission system. The ERCOT-ISO also serves as agent for procuring ancillary services for those who elect not to provide their own ancillary services.
      Power sales or purchases from one location to another may be constrained by the power transfer capability between locations. Under current ERCOT protocol, the commercially significant constraints and the transfer capabilities along these paths are reassessed every year and congestion costs are directly assigned to those parties causing the congestion. This has the potential to increase power generators’ exposure to the congestion costs associated with transferring power between zones.
      The PUCT has adopted a rule directing the ERCOT-ISO to develop and implement a wholesale market design that, among other things, includes a day ahead energy market and replaces the existing zonal wholesale market design with a nodal market design that is based on locational marginal prices for power. See “— Regulatory Developments — Regional Businesses — Market Developments — Texas (ERCOT) Region.” One of the stated purposes of the proposed market restructuring is to reduce local (intra-zonal) transmission congestion costs. The market redesign project is expected to take effect in 2009. We expect that implementation of any new market design will require modifications to our procedures and systems. Although we do not expect the combined company’s competitive position in the ERCOT market will be materially adversely affected by the proposed market restructuring, we do not know for certain how the planned market restructuring will affect our revenues, and some of the combined company’s plants in ERCOT may experience adverse pricing effects due to their location on the transmission grid.
PUCT Mandated Auctions
      PUCT regulation required firm entitlements to 15% of NRG’s operating installed generation capacity to be sold at auction through December 31, 2006, at opening bid prices well below NRG’s cost for 2006. On December 7, 2005, Texas Genco filed an application with the PUCT requesting the PUCT to determine that we were no longer required to conduct mandated auctions because 40% or more of the electric power

22


Table of Contents

consumed by the residential and small commercial customers within the CenterPoint Energy Houston Electric, LLC certificated service area before the onset of customer choice is now provided by nonaffiliated retail electric providers. On February 6, 2006, the Staff of the PUCT reported that ERCOT had performed the analysis and calculations necessary to demonstrate that we have satisfied the 40% threshold. The Staff recommended that the petition be granted and that we be released from any further capacity auction requirements. The administrative law judge issued her proposal for decision, and a decision by the PUCT is expected in March.
NORTHEAST REGION
      NRG’s second largest asset base is located in the Northeast region of the United States and is comprised of investments in generation facilities primarily located in the physical control areas of NYISO, the ISO-NE and PJM.
Operating Strategy
      The Northeast region strategy is focused on optimizing the value of our broad and varied generation portfolio in three interconnected and actively traded competitive markets: the NYISO, the ISO-NE and the PJM. In our Northeast markets, load serving entities generally lack their own generation capacity, much of the generation base is aging, and the current ownership of the generation is highly disaggregated. Thus, commodity prices are more volatile on an as-delivered basis than in other regions due to the distances and occasional physical constraints impacting delivery of fuels into the region. In this environment, we seek both to enhance our ability to be the low cost wholesale generator capable of delivering wholesale power to load centers within the region from multiple locations using multiple fuel sources, and to be properly compensated for delivering such wholesale power and related services. The generation performance by fuel type for the recent three-year period is as shown below:
                           
    Net Generation (MWh)
     
    2005   2004   2003
             
    (In thousands)
Coal
    10,369       10,664       9,783  
Oil
    3,158       1,381       1,471  
Gas
    1,724       1,160       1,172  
                   
 
Total
    15,251       13,205       12,426  
                   
      Several of our Connecticut assets are located in transmission-constrained load pockets and have been designated as required to be available to ISO-NE to ensure reliability. These assets are subject to reliability must-run, or RMR, agreements, which are contracts under which we agree to maintain our facilities to be available to run when needed, and are paid for providing these capability services based on our costs. We are focused on capturing the locational value of our plants that are located in or near load centers and inside chronic transmission constraints, in order to improve the economic rationale for repowering of those sites. We do this principally through the advocacy of capacity market reforms, e.g., locational installed capacity markets that generate adequate returns for wholesale power generators.
      We continue to evaluate opportunities to redevelop our existing sites as well as opportunities for acquisitions in the Northeast region. The redevelopment opportunities for our existing sites include expanding sites with high efficiency, intermediate and peaking units, converting coal or oil sites to cleaner technologies, redeveloping existing sites with projects using IGCC technology, as well as reconfiguring the existing sites to burn renewable fuel sources. Redevelopment opportunities have been identified for each site in the Northeast and we have established priorities based on expected financial returns and probability of success. To facilitate redevelopment opportunities, we are pursuing contractual arrangements to support significant redevelopment capital expenditures via direct negotiations with relevant agencies and potential power purchasers as well as through request for proposal processes. We also continue to pursue contractual arrangements to support the

23


Table of Contents

construction costs of potential new facilities and acquisition opportunities through public auction processes as well as by initiating discussions with various parties on potential opportunities.
Facilities
      As of December 31, 2005, NRG’s facilities in the Northeast region consisted of approximately 7,099 MW of generation capacity, including assets located in transmission constrained areas, such as in-city New York City (1,394 MW) and southwest Connecticut (538 MW). The Northeast region power generation assets are summarized in the table below:
                                 
            Net    
            Generation    
            Capacity    
Plant   Location   % Owned   (MW)*   Primary Fuel Type
                 
Oswego
    Oswego, NY       100.0 %     1,634       Oil  
Arthur Kill
    Staten Island, NY       100.0 %     841       Natural Gas  
Middletown
    Middletown, CT       100.0 %     770       Oil  
Indian River
    Millsboro, DE       100.0 %     737       Coal  
Astoria Gas Turbines
    Queens, NY       100.0 %     553       Natural Gas  
Dunkirk
    Dunkirk, NY       100.0 %     522       Coal  
Huntley
    Tonawanda, NY       100.0 %     552       Coal  
Montville
    Uncasville, CT       100.0 %     497       Oil  
Norwalk Harbor
    So. Norwalk, CT       100.0 %     342       Oil  
Devon
    Milford, CT       100.0 %     124       Natural Gas  
Vienna
    Vienna, MD       100.0 %     170       Oil  
Somerset Power
    Somerset, MA       100.0 %     127       Coal  
Connecticut Remote Turbines
    Various locations in CT       100.0 %     104       Oil  
Conemaugh
    New Florence, PA       3.7 %     64       Coal  
Keystone
    Shelocta, PA       3.7 %     63       Coal  
                         
Total Northeast Region
                    7,099          
                         
 
Excludes 382 MW of inactive capacity.
     The following are descriptions of our most significant revenue generating plants in the Northeast region:
      Arthur Kill. NRG’s Arthur Kill plant is a natural gas-fired power plant consisting of three units and is located on the west side of Staten Island, New York. The plant produces an aggregate generation capacity of 841 MW from two intermediate load units (Units 20 and 30) and one peak load unit (Unit GT-1). Unit 20 produces an aggregate generation capacity of 335 MW and was installed in 1959. Unit 30 produces an aggregate generation capacity of 491 MW and was installed in 1969, and both Units were converted from steam engines in the early 1990s. We may need to upgrade the plant in the future to comply with environmental regulations. If upgrades are needed it could cost several million dollars.
      Astoria Gas Turbines. Adjacent to LaGuardia airport in Queens, New York, Astoria provides power to the local New York City load pockets. The facility has an aggregate generation capacity of 553 MW from 19 operational combustion turbine engines. The turbine engines are peak gas-fired and/or oil-fired installed in the early 1970s. The engines are classified into three classes, which are then grouped into ten Astoria Gas Turbine units. These units consist of Buildings 2, 3 and 4, which have a total net generation capacity of 431 MW and will be retired in 2022. Units 5, 7 and 8, which are Class 2 turbine engines, have a net generation capacity totaling approximately 42 MW; and will be retired in 2015. Units 10, 11, 12 and 13, which are Class 3 turbine engines have a total net generation capacity of 80 MW, will be retired in 2015 as well.

24


Table of Contents

      Dunkirk. NRG’s Dunkirk plant is a coal-fired plant located on Lake Erie in Dunkirk, New York. This plant produces an aggregate generation capacity of 522 MW from four baseload units. Units 1 and 2 produce up to 81 MW each and were put in service in 1950. Units 3 and 4 produce approximately 180 MW each and were put in service in 1959 and 1960, respectively. The plant is currently implementing changes to switch from eastern bituminous coal to low sulfur PRB coal in order to comply with various federal and state emissions standards, as well as the NYSDEC settlement referred to in the following paragraph. The conversion will be completed for all units by Spring 2006.
      Huntley. NRG’s Huntley plant is a coal-fired plant consisting of six units and is located in Tonawanda, New York, approximately three miles north of Buffalo. The plant has a generation capacity of 552 MW from two intermediate load units (Units 65 and 66) and two baseload units (Units 67 and 68). Units 67 and 68 generate a net capacity of approximately 190 MW each and were put in service in 1957 and 1958, respectively. Units 65 and 66 generate a net capacity of 86 MW each and were put in service between 1942 and 1954. Units 63 and 64 are currently inactive. At the end of 2005, NRG gave notice to the New York Public Service Commission, or NYPSC, of its intent to retire Units 63 and 64 in early 2006, subject to NYPSC approval. As part of a settlement reached with the New York Department of Environmental Conservation, or NYSDEC, in January 2005, NRG will reduce NOx and SOx emissions from its Huntley and Dunkirk plants through 2013 in the aggregate by over 80% and 86%, respectively. A portion of these reductions has been achieved through the switch to PRB coal and related projects completed at the plant that have already been expended or committed to.
Market Framework
      Although each of the three northeast ISOs and their respective energy markets are functionally, administratively and operationally independent, they all follow, to a certain extent, similar market designs. Each ISO dispatches power plants to meet system energy and reliability needs, and settles physical power deliveries at locational marginal prices, or LMPs, which reflect the value of energy at a specific location at the specific time it is delivered. This value is determined by an ISO-administered auction process, which evaluates and selects the least costly supplier offers or bids to create a reliable and least-cost dispatch. The ISO-sponsored LMP energy markets consist of two separate and characteristically distinct settlement time frames. The first is a security-constrained, financially firm, day-ahead unit commitment market. The second is a security-constrained, financially settled, real-time dispatch and balancing market. Prices paid in these LMP energy markets, however, are affected by, among other things, market mitigation measures which can result in lower prices associated with certain generating units that are mitigated because they are deemed to have locational market power, and by $1000/ MWh energy market price caps that are in place in all three northeast ISOs.
      In addition to energy delivery, the ISOs manage secondary markets for installed capacity, ancillary services and financial transmission rights. All of the three northeastern ISOs have realized, however, that they are not capable of supporting needed investment in new generation without well designed capacity and ancillary service markets. NYISO’s capacity market was the first to receive approval of its proposed demand curve and locational capacity reforms (which are intended to better reflect locational values of capacity resources). ISO-NE and PJM have both proposed their respective versions of reformed capacity markets, namely, a locational installed capacity market, or LICAP in ISO-NE, and a reliability pricing model, or RPM proposal in PJM. These proposals are currently pending before FERC. Also see further discussion in Item 15 — Note 26 Regulatory Matters.
SOUTH CENTRAL REGION
      As of December 31, 2005, NRG owned approximately 2,395 MW of generating capacity in the South Central region of the United States. The region lacks an ISO and, therefore, remains a bilateral market, making it less transparent than a region with an ISO-administered energy market using large scale economic dispatch (such as the Northeast markets discussed above). Our plants in the South Central region operate as their own control area, the South Central control area. As a result, the South Central control area is capable of providing control area services, in addition to wholesale power, that enables NRG to provide full requirement

25


Table of Contents

services to load serving utilities, thus making the South Central control area a competitive alternative to the integrated utilities operating in the region.
Operating Strategy
      Our South Central region seeks to capitalize on two factors: our position as a significant coal-fired generator in a market which is highly dependent on natural gas for power generation purposes; and our long-term contractual and historical service relationship with 11 rural cooperatives around Louisiana. We are working with our cooperative customers to improve contract administration, to expand their and our customer base on terms advantageous to all parties and, in some cases, to modify the terms of our contracts with respect to our current or new customers.
      The generation performance by fuel type for the recent three-year period is as shown below:
                           
    Net Generation (MWh)
     
    2005   2004   2003
             
    (In thousands)
Coal
    10,103       10,469       10,318  
Gas
    14       2       27  
                   
 
Total
    10,117       10,471       10,345  
                   
      As part of our strategy, we are examining all of our sites in the South Central region for possible brownfield development. In particular, we continue the development of the new 675 MW Big Cajun II Unit 4 super critical coal-fired generating unit. On August 22, 2005, NRG received the Title V Air Permit from the Louisiana Department of Environmental Quality. On October 14, 2005, Washington Group International was selected as the owner’s engineer. We continue to aggressively pursue equity partners and off-takers for the output of the unit. We continue to look for opportunities to acquire assets that will enhance our portfolio and long-term strategic goals.
Facilities
      NRG’s generating assets in the South Central region consist primarily of its net ownership of power generation facilities in New Roads, Louisiana, which we refer to as Big Cajun II, and also includes the Sterlington, Bayou Cove and Big Cajun peaking facilities. NRG’s power generation assets in the South Central region as of December 31, 2005 are summarized in the table below:
                             
            Net    
            Generating    
            Capacity   Primary Fuel
Plant   Location   % Owned   (MW)   Type
                 
Big Cajun II(1)
    New Roads, LA       86.0 %     1,489     Coal
Bayou Cove
    Jennings, LA       100.0 %     300     Natural Gas
Big Cajun I — (Peakers) Units 3 & 4
    New Roads, LA       100.0 %     210     Natural Gas
Big Cajun I — Units 1 & 2
    New Roads, LA       100.0 %     220     Natural Gas/Oil
Sterlington
    Sterlington, LA       100.0 %     176     Natural Gas
                       
Total South Central
                    2,395      
                       
 
(1)  NRG owns 100% of Units 1 & 2; 58% of Unit 3
     Big Cajun II. Our most significant revenue generating plant in the South Central region is the Big Cajun II facility. Big Cajun II plant is a coal-fired, sub-critical heat baseload plant located along the banks of the Mississippi River, upstream from Baton Rouge. This plant includes three coal-fired generation units (Units 1, 2 and 3) with an aggregate generation capacity of 1,730 MW as of December 31, 2005, and generation capacity per unit of 580 MW, 575 MW and 575 MW, respectively. The plant uses coal supplied by the Powder River Basin and was commissioned between 1981 and 1983. NRG owns 100% of Units 1 and 2 and 58% of Unit 3 for an aggregate owned capacity of 1,489 MW (86.0%) of the plant. All three units have

26


Table of Contents

been upgraded with low NOx burners and over fire air. The Unit 1 generator has recently been rewound and was optimized with a modern turbine/exciter control system. Units 2 and 3 are planned for generator rewinds, turbine/exciter control replacements and additional neural net systems in future years. These efficiency improvements are expected to cost approximately $30 million.
Market Framework
      NRG’s assets in the South Central region are located within the franchise territories of vertically integrated utilities, primarily Entergy Corp., or Entergy. Entergy performs the scheduling, reserve and reliability functions that are administered by the ISOs in certain other regions of the United States and Canada. Although the reliability functions performed are essentially the same, the primary differences between these markets lie in the physical delivery and price discovery mechanisms. In the South Central region, all power sales and purchases are consummated bilaterally between individual counterparties. Transacting counterparties are required to reserve and purchase transmission services from the relevant transmission owners at their FERC-approved tariff rates. Included with these transmission services are the reserve and ancillary costs.
      As of December 31, 2005, NRG had long-term all-requirements contracts with 11 Louisiana distribution cooperatives. The agreements are standardized into three types, Forms A, B and C and have the terms, contract loads and customers as shown in the table below:
                         
        Estimated    
    Expiration   Contract Load   Customers
             
Form A
    March 2025       42 %     6  
Form B
    March 2025       3 %     1  
Form C
    March 2009-2014       42 %     4  
      NRG also has long-term contracts with the Municipal Agency of Mississippi, South Mississippi Electric Power Association, and Southwestern Electric Power Company, which collectively comprise an additional 13% of contract load.
      At peak demand periods, NRG’s Big Cajun II assets are insufficient to serve the requirements of the customers under these contracts, and at such times, NRG typically purchases power from other power producers in the region, frequently at higher prices than can be recovered under our contracts. As the loads of our customers grow, we can expect this imbalance to worsen, unless we are successful in renegotiating the terms of our long-term contracts.
      We are currently in negotiations with these customers to achieve contractual amendments that limit incremental load growth at contract rates for large industrial and municipal loads. To date, we have been successful in achieving such amendments with two of the eleven cooperative contracts.
      As a result of Hurricanes Katrina and Rita in August and September 2005, NRG recognized a loss of approximately $1.3 million for damaged assets. Four of the South Central region’s 11 cooperative customers suffered extensive losses to their distribution systems, and the region suffered a drop in contract sales during the ensuing power outages. By year-end, loads have largely returned to normal for three of the four hard-hit cooperatives, while the fourth cooperative continues to face challenges in rebuilding. The load loss and the transmission constraints had offsetting impacts on the South Central region’s margins resulting in gross margins that were $4 million below expectations. In addition, NRG created a reserve for a receivable from Entergy New Orleans of $1.9 million because of its hurricane-related bankruptcy.
WESTERN REGION
      As of December 31, 2005, NRG owned approximately 1,044 MW of generating capacity in the Western region of the United States (California), of which approximately 904 MW is through a 50% interest in WCP Holdings. On December 27, 2005, NRG entered into a purchase and sale agreement to acquire Dynegy’s 50% ownership interest in West Coast Power to become the sole owner of power plants totaling approximately

27


Table of Contents

1,800 MW of generation capacity in the Western region. The transaction, which is subject to regulatory approval, is expected to close in the first quarter of 2006.
Operating Strategy
      Our Western region strategy is focused on maximizing the cash flow and value associated with our generating plants while protecting and potentially realizing the commercial value of the underlying real estate in case our following initiatives do not generate value. There are three principal components to this strategy. First, we are focused on influencing market reforms in California to provide an energy market environment where our capacity can be offered into centrally administered competitive auctions, such as we see in the Northeast, and also provide for the negotiation of bilateral transactions for both energy and capacity. Second, we are preparing our sites for the construction of new capacity to meet increasing local area requirements. At El Segundo, NRG has a California Energy Commission, or CEC, permit to construct a new combined cycle plant to replace the retired units at the site. At the Long Beach site, NRG has land available to construct new peaking capacity. NRG is developing plans for site remediation and preparation in anticipation of a new request for new capacity from load serving entities. Third, we are engaged in the identification of collaborative value enhancing projects with communities and businesses located near our plants. West Coast Power’s plants are, for example, considered excellent candidates for the co-location of desalination plants. In case the said initiatives fail, we are taking active steps to assess the value of our property for non-power generation purposes. The real estate value from our plant locations is promising as two of West Coast Power’s plants are situated at choice locations on the Pacific coast.
      NRG’s assets in the Western region include three additional power plants, Red Bluff and Chowchilla (94 MW total), located in northern California that have some locational value and one plant in Henderson, Nevada (Saguaro), that is contracted to Nevada Power and two steam hosts. NRG has entered into a resource adequacy agreement with PG&E Corporation, or PG&E, for the capacity of the Red Bluff and Chowchilla units that expires December 31, 2007. The Saguaro plant in Nevada is contracted to Nevada Power through 2022, one steam host (Pioneer) whose contract expires in 2007 (with a negotiated renewal) and a steam off taker (Ocean Spray), whose contract runs through 2015. The Saguaro plant had a long-term gas supply agreement that expired in July 2005 and the plant is now exposed to the monthly spot gas market. At present, Saguaro cannot pass higher natural gas costs through to its customers, and the plant is currently experiencing negative cash flows. Consequently, during 2005, we wrote down our equity investment in Saguaro by approximately $27 million. NRG is currently researching a number of alternatives for its investment in Saguaro.

28


Table of Contents

Facilities
      NRG’s power generation assets in the Western region as of December 31, 2005 are summarized in the table below:
                                   
            Net    
            Generation    
            Capacity   Primary Fuel
Plant   Location   % Owned   (MW)   Type
                 
WCP(1)
                               
 
Encina
    Carlsbad, CA       50.0%       483       Natural Gas  
 
El Segundo
    El Segundo, CA       50.0%       335       Natural Gas  
 
Cabrillo II
    San Diego, CA       50.0%       86       Natural Gas  
                         
Total WCP
                    904          
                         
Other Western Region Assets
                               
 
Saguaro
    Henderson, NV       50.0%       46       Natural Gas  
 
Chowchilla
    Northern CA       100.0%       49       Natural Gas  
 
Red Bluff
    Northern CA       100.0%       45       Natural Gas  
                         
                      140          
                         
Total Western Region
                    1,044          
                         
 
(1)  On December 27, 2005, NRG entered into a purchase and sale agreement to acquire Dynegy’s 50% ownership interest in WCP Holdings to become the sole owner of power plants totaling approximately 1,800 MW of generation capacity in the Western region. The transaction is expected to close in the first quarter of 2006.
     NRG’s assets in the Western region consist primarily of older, higher heat rate, gas-fired plants in southern California. These plants, while older and less efficient than newer combined cycle plants, possess locational advantages during peak hours when the newer, remotely located plants are unable to get through transmission congestion in southern California. As a result, the Cal ISO designated NRG’s El Segundo, Encina and Cabrillo II plants as RMR qualifying units in 2005, and therefore those plants are entitled to certain fixed-cost payments from the Cal ISO for the right to dispatch those units during periods of locational constraints. Initially, transmission upgrades by Southern California Edison and San Diego Gas and Electric in 2005 caused the Cal ISO to drop the RMR designation for both El Segundo and the Encina Unit 4 for 2006. However, Cal ISO designated Encina Unit 4 as an RMR unit in a letter to Cabrillo Power I dated December 22, 2005, and a filing requesting FERC approval of the requisite changes to Cabrillo Power I’s RMR agreement for 2006 was made on December 29, 2005. This change, if approved, will assure that Encina Units 4 and 5 will receive partial cost recovery under RMR and both units will be available in the market for 2006.
Market Framework
      The majority of NRG’s assets in the Western region are located within the control area of the Cal ISO. The Cal ISO operates a financially settled real time balancing market. There are currently no organized day ahead markets in the Western region and such forward markets in California currently operate similarly to those in the ERCOT market with all power sales and purchases consummated bilaterally between individual counterparties and scheduled for physical delivery with the Cal ISO. All plants are subject to the FERC “must offer” order, an order instituted during the energy crisis of 2000-2001 requiring any generator capable of operating and not subject to a bilateral agreement to make its capacity available to Cal ISO. The compensation paid by the Cal ISO for such service generally covers only variable costs. Additionally, California generators remain subject to a $250 per MWh price cap, another legacy of the energy crisis mentioned above. FERC approved an increase in the “softcap” from $250 per MWh to $400 per MWh, effective January 1, 2006. NRG is working with various industry groups and governmental authorities to put

29


Table of Contents

market reforms in place in California that will encourage new investment and enable generators to earn acceptable returns on new and existing investments.
      WCP will continue to pursue repowering opportunities at the El Segundo, Encina and Long Beach plants where grid stability and in-load resource adequacy is needed. On December 23, 2004, the CEC approved NRG’s application for a permit to repower the existing El Segundo site and replace retired units 1 and 2 with 630 MW of new combined cycle generation. On January 19, 2005, the CEC voted unanimously to reconsider its December 23, 2004 decision to certify the repowering project. The reconsideration hearing took place on February 2, 2005 and the permit was approved by unanimous vote of the CEC. The reconsideration extended the 30-day period in which parties may petition for rehearing or seek judicial review to March 4, 2005. A petition seeking review of the CEC final order was filed with the California Supreme Court on March 14, 2005. On August 31, 2005, the California Supreme Court refused to hear the case, making that date the effective date of the permit. The El Segundo permit has as a condition the payment of $5 million by the project to the Santa Monica Bay Restoration Fund with the first $1 million being due in equally quarterly installments beginning 30 days following the disposition of all appeals. The initial quarterly payment has been made. Should we elect to repower the Long Beach site, we will do it outside of the CEC permitting process. We do not believe the CEC can legally assert jurisdiction over a Long Beach repowering project as the total anticipated megawatts added will be less than the number of megawatts retired. The California Court of Appeals, in a case involving the Los Angeles Department of Water and Power, held that the CEC jurisdiction is only required where the total megawatts added exceed the existing megawatts of capacity by over 50 megawatts.
      In California, the Cal ISO continues with its plan to move toward markets similar to PJM, NYISO and ISO-NE with its Market Redesign & Technology Upgrade, or MRTU — formerly MD02. These changes, once implemented, will re-establish a day-ahead time market and allow for multiple settlements. We view this as a vast improvement to the existing structure. In general, the Cal ISO is continuing along a path of small incremental changes rather than significant market restructuring. Although numerous stakeholder meetings have been held, the final market design remains unknown at this time. The effect of the new MRTU changes on us cannot be determined at this time. In addition to that activity, the California Public Utility Commission, or CPUC, recently issued their Resource Adequacy Order, which we believe will ultimately create greater opportunities for merchant generators in California. However, the final order did delay the implementation of local capacity requirements and allowed a liberalized phase out of firm liquidated damages contracts, which may act as a disincentive for load serving entities to contract for our capacity over the next two years. Assembly Bill 1576 which will promote and codify the recovery of costs from repowered facilities — thus making contracting from these sites more attractive to the in-state-utilities, was passed by the Senate on September 8, 2005, and signed by the Governor on September 29, 2005. This provides opportunities for the Western region, as WCP currently holds a permit for repowering up to 630 MW at the El Segundo facility and options for redevelopment at the Long Beach facility. Both facilities are positioned for possible long-term contracts as the market rules and structure fall into place in the near future.
      The CEC recently issued their 2005 Energy Report — Range of Need and Policy Recommendations To the California Public Utilities Commission, or CPUC. That study confirmed that the SCE franchise territory will require over 8,000 MW of new generation capacity by 2009; a dire prediction for a state with limited new resources coming on line and retirement of older facilities accelerating. There is some indication that the various regulatory agencies are responding to these warnings by moving to design a market that will provide the incentives to invest in new generation. The CPUC now requires that load-serving entities meet a 15-17% reserve margin by June 2006. This has prompted RFOs from load-serving entities, with the stated goal of engaging in bilateral contract negotiations with the merchant generators to secure their long-term capacity needs. Load-serving entities must demonstrate, by January 27, 2006 and by September 30 for each year thereafter that they have secured at least 90% of their capacity needs for the following year. The CPUC order requiring a demonstration of adequate capacity should present opportunities to enter into new bilateral agreements pursuant to competitive RFO processes. The Red Bluff and Chowchilla facilities have received capacity contracts for the period April 1, 2006 through December 31, 2007 from a major load serving entity.

30


Table of Contents

The capacity for El Segundo Units 3 and 4 has been secured under a tolling agreement with a major load serving entity for the period May 2006 through April 2008.
      In September 2004, Governor Schwarzenegger vetoed AB2006, commonly referred to as the “re-regulation” initiative. A proposition (Proposition 80) that would amend legislation forever prohibiting “customer choice” in California was defeated in a November 2005 special election.
OTHER
Other North American Assets
      As of December 31, 2005, NRG owned approximately 1,467 MW of generating capacity in other segments of the United States. NRG’s other North American power generation assets are summarized in the table below:
                           
            Net    
            Generating    
            Capacity    
Plant   Location   % Owned   MW   Primary Fuel Type
                 
Audrain*
  Vandalia, MO     100.0%       577     Natural Gas
Rockford I (Peaker)
  Rockford, IL     100.0%       310     Natural Gas
Rocky Road Partnership*
  East Dundee, IL     50.0%       165     Natural Gas
Rockford II (Peaker)
  Rockford, IL     100.0%       160     Natural Gas
Dover
  Dover, DE     100.0%       104     Natural Gas/Coal
Power Smith Cogeneration
  Oklahoma City, OK     6.25%       7     Natural Gas
Ilion Cogeneration*
  New York     100.0%       58     Natural Gas
James River
  Virginia     50.0%       55     Coal
Cadillac*
  Cadillac, MI     50.0%       19     Wood
Paxton Creek
  Harrisburg, PA     100.0%       12     Natural Gas
                     
 
Other North American Assets
                1,467      
                     
 
Certain of the above projects are in transition. The Audrain project is under contract for sale. Closing is expected in 2006. NRG is in advanced discussions regarding the sale of the Cadillac project. NRG is currently performing under an agreement whereby the Ilion project will be disconnected and terminated. On December 27, 2005, NRG entered into a purchase and sale agreement with Dynegy through which NRG will sell to Dynegy its 50% ownership interest in the jointly held entity that owns the Rocky Road power plant. The transaction is conditioned upon NRG’s acquisition of Dynegy’s 50% interest in WCP Holdings and is expected to close in the first quarter of 2006.
Australia and All Other Generation and Non-Generation Assets
      As of December 31, 2005, NRG, through certain foreign subsidiaries, had investments in power generation projects located in Australia, Germany and Brazil with approximately 1,916 MW of total generating capacity. In addition, NRG owns interests in coal mines located in Australia and Germany.

31


Table of Contents

      NRG’s international power generation assets as of December 31, 2005 are summarized in the table below:
                                 
            Net    
            Generating    
            Capacity   Primary
Plant   Location   % Owned   MW   Fuel Type
                 
Operating Assets
                               
Flinders
    Australia       100.0 %     700       Coal  
Gladstone
    Australia       37.5 %     605       Coal  
Schkopau
    Germany       41.9 %     400       Coal  
MIBRAG(1)
    Germany       50.0 %     55       Coal  
Itiquira
    Brazil       99.2 %     156       Hydro  
                         
Total International Assets
                    1,916          
                         
 
(1)  Primarily a coal mining facility. Approximately 90% of MIBRAG’s revenues represent coal sales and 8% represent electricity sales. MIBRAG owns 110 MW of net exportable generation. Approximately two-thirds of that amount is sold to third parties and one-third is used to power mining and other MIBRAG operations. NRG equity in net exportable electricity is 55 MW.
Australia
      Asset Management Strategy. Our strategy for maximizing our return on investment in our assets concentrates on effective contract management, operating the plant to ensure safe and efficient operations and management of the equity investment, including cash flow and finances. NRG is currently considering strategic alternatives with respect to Australia either to reposition its assets more effectively within the National Electricity Market or to monetize its investment. We will seek to determine the best option to optimize our investment by the end of the second quarter of 2006.
      NRG Flinders Assets. NRG Flinders is a merchant generation business that derives revenue from bidding its generation output into the South Australian region of the National Electricity Market, or NEM, by trading the plant as a portfolio, selling derivative hedges that are not plant specific and supplying minor retail sales via contract. The bidding of the plant as a portfolio supports strategies for maximizing revenue of the entire portfolio both in terms of pool and derivative revenues and the most economic fuel use. A hedge book is maintained such that the short to medium term revenue is secured via hedge levels up to and in the order of 75-80% of the plant output. The current book is underpinned by a medium term hedge with a major South Australian retailer.
      The Gladstone Assets. We are the operators of the Gladstone facility, however, the Gladstone assets are owned in an unincorporated joint venture with other investors and NRG does not have unilateral control over management of the assets. Gladstone Power Station is fully contracted via a power purchase agreement and a capacity purchase agreement with Boyne Smelter Limited and Enertrade through 2029. Enertrade is a state owned company that trades the excess power in the NEM.
Germany
Asset Management Strategy
      Our German assets are owned in partnership with other investors and NRG does not have direct control over operations. Our strategy for maximization of return on investment therefore concentrates on the following: contract management, monitoring of our facility operators to ensure safe, profitable and sustainable operations; management of cash flow and finances; and growth of our businesses through investments in projects related to our current businesses.

32


Table of Contents

Thermal and Chilled Water Businesses
      NRG Thermal’s thermal and chilled water businesses have a steam and chilled water capacity of approximately 1,225 megawatt thermal equivalents, or MWt.
      As of December 31, 2005, NRG Thermal owned heating and cooling systems that provide steam heating to approximately 555 customers and chilled water to 95 customers in five different cities in the United States. In addition, as of that date, NRG Thermal owned and operated three projects that serve industrial/government customers with high-pressure steam and hot water, an 88 MW combustion turbine peaking generation facility and an 16 MW coal-fired cogeneration facility in Dover, Delaware and a 12 MW gas-fired project in Harrisburg, Pennsylvania. Approximately 34% of Thermal’s revenues are derived from its district heating and chilled water business in Minneapolis, Minnesota.
      Both our NRG Energy Center Pittsburgh and our NRG Energy Center Harrisburg anticipate filing rate cases during 2006 seeking increased rates under their tariffs for steam services as well as chilled water for Pittsburgh.
Resource Recovery Facilities
      NRG’s Resource Recovery business owns and operates fuel processing projects. The alternative fuel currently processed is municipal solid waste, approximately 85% of which is processed into refuse derived fuel, or RDF. NRG’s Resource Recovery business has municipal solid waste processing capacity of 3,000 tons per day. NRG’s Resource Recovery business owns and operates NRG Processing Solutions, which includes 14 composting and processing sites in Minnesota, of which five sites are permitted to operate as municipal solid waste transfer stations.
Competition
      Wholesale power generation is a capital-intensive, commodity-driven business with numerous industry participants. We compete on the basis of the location of our plants and owning multiple plants in our regions, which increases the stability and reliability of our energy supply. Wholesale power generation is fundamentally a local business which, at present, is highly fragmented (relative to other commodity industries) and diverse in terms of industry structure. As such, there is a wide variation in terms of the capabilities, resources, nature and identity of the companies we compete against from market to market.
Employees
      As of December 31, 2005, the combined company has 3,682 employees, approximately 1,694 of whom were covered by U.S. bargaining agreements. During 2005, neither NRG nor Texas Genco experienced any significant labor stoppages or labor disputes at their facilities.
Energy Regulatory Matters
      As operators of power plants and participants in wholesale energy markets, we are subject to regulation by various federal and state government agencies. These include FERC, NRC, PUCT and certain other state public utility commissions in which our generating assets are located. In addition, we are also subject to the market rules, procedures and protocols of the various ISO markets in which we participate.
      The plant operations of, and wholesale electric sales from our Texas assets are not currently subject to regulation by FERC, as they are deemed to operate solely within the ERCOT and not in interstate commerce. As discussed below, these operations are subject to regulations by PUCT as well as to regulation by the NRC with respect to its ownership interest in the STP.
Federal Energy Regulatory Commission
      FERC, among other things, regulates the transmission and wholesale sale of electricity in interstate commerce under the authority of the Federal Power Act, or FPA. In addition, under existing regulations,

33


Table of Contents

FERC determines whether an entity owning a generation facility is an Exempt Wholesale Generator, or EWG, as such was defined in the Public Utility Holding Company Act of 1935, or PUHCA of 1935. FERC also determines whether a generation facility meets the ownership and technical criteria of a Qualifying Facility, or QF, under Public Utility Regulatory Policies Act of 1978, or PURPA. Each of NRG’s U.S. generating facilities has either been determined by FERC to qualify as a QF, or the subsidiary owning the facility has been determined to be an EWG.
      The Energy Policy Act of 2005. EPAct 2005 was enacted into law on August 8, 2005. Among other things, EPAct 2005 repealed PUHCA of 1935, amended PURPA to remove statutory restrictions on utility ownership of a QF and to remove a utility’s obligation to buy from a QF under certain circumstances, and enacted the Public Utility Holding Company Act of 2005, or PUHCA of 2005. EPAct 2005’s PUHCA changes became effective February 8, 2006. EPAct 2005’s amendments to PURPA were effective as of August 8, 2005. Though generally supported by the industry and viewed as a positive development, EPAct 2005 remains subject to FERC interpretation, and FERC has issued several rulemakings and rules to implement EPAct, some of which are still ongoing. NRG is currently assessing the effect of EPAct 2005 and these rulemakings issued by FERC to implement it on the company’s regulatory environment and business.
      Federal Power Act. The FPA gives FERC exclusive rate-making jurisdiction over wholesale sales of electricity and transmission of electricity in interstate commerce. Under the FPA, FERC, with certain exceptions, regulates the owners of facilities used for the wholesale sale of electricity or transmission in interstate commerce as public utilities. The FPA also gives FERC jurisdiction to review certain transactions and numerous other activities of public utilities. NRG’s QFs are currently exempt from the FERC’s rate regulation under Sections 205 and 206 of the FPA to the extent that sales are made pursuant to a contract established under PURPA and are not made under a market-based rate authorization from FERC.
      Public utilities under the FPA are required to obtain FERC’s acceptance, pursuant to Section 205 of the FPA, of their rate schedules for wholesale sales of electricity. All of NRG’s non-QF generating companies and power marketing affiliates in the United States make sales of electricity pursuant to market-based rates authorized by FERC. FERC’s orders that grant NRG’s generating and power marketing companies market-based rate authority reserve the right to revoke or revise that authority if FERC subsequently determines that NRG can exercise market power in transmission or generation, create barriers to entry or engage in abusive affiliate transactions. In addition, our market-based sales are subject to certain market behavior rules and, if any of our generating or power marketing companies were deemed to have violated one of those rules, they would be subject to potential disgorgement of profits associated with the violation and/or suspension or revocation of their market-based rate authority, as well as criminal and civil penalties. As a condition to the orders granting us market-based rate authority, every three years NRG is required to file a market update to show that it continues to meet FERC’s standards with respect to generation market power and other criteria used to evaluate whether entities qualify for market-based rates. NRG is also required to report to FERC any material changes in status that would reflect a departure from the characteristics that FERC relied upon when granting NRG’s various generating and power marketing companies’ market-based rates. If NRG’s generating and power marketing companies were to lose their market-based rate authority, such companies would be required to obtain FERC’s acceptance of a cost-of-service rate schedule and would become subject to the accounting, record-keeping and reporting requirements that are imposed on utilities with cost-based rate schedules.
      Section 204 of the FPA gives FERC jurisdiction over a public utility’s issuance of securities or assumption of liabilities. However, FERC typically grants blanket approval for future securities issuances or assumptions of liabilities to entities with market-based rate authority. In the event that one of NRG’s public utility generating companies were to lose its market-based rate authority, such company’s future securities issuances or assumptions of liabilities could require prior approval from FERC.
      Section 203 of the FPA requires FERC’s prior approval for the transfer of control over assets subject to FERC’s jurisdiction. EPAct 2005 amended this prior approval authority in a number of ways. In particular, transactions involving only generation assets which were previously exempt from FERC review under Section 203 of the FPA will now be subject to such review provided they meet the new $10 million threshold.

34


Table of Contents

The provisions of EPAct 2005 relating to prior approval of asset acquisitions under the FPA and FERC’s rules promulgated thereafter became effective February 8, 2006.
      PUHCA. As discussed above, EPAct 2005 repealed PUHCA of 1935, effective February 8, 2006, and replaces it with PUHCA of 2005. PUHCA of 2005 provides FERC with certain authority over and access to books and records of public utility holding companies not otherwise exempt by virtue of their ownership of EWGs, QFs and Foreign Utility Companies, or FUCOs. Because all of NRG’s generating facilities have QF status or are owned through EWGs or FUCOs, NRG does not currently qualify as a “holding company” under PUHCA of 2005. As noted above, FERC has a rulemaking ongoing to implement PUHCA 2005, and several companies have sought clarification of FERC’s rules.
      Public Utility Regulatory Policies Act. PURPA was passed in 1978 in large part to promote increased energy efficiency and development of independent power producers. PURPA created QFs to further both goals, and FERC is primarily charged with administering PURPA as it applies to QFs. As discussed above, under current law, some categories of QFs may be exempt from regulation under the FPA as public utilities. PURPA incentives also initially included a requirement that utilities must buy and sell power to QFs. As noted above, EPAct 2005 has amended several provisions of PURPA. Among other things, EPAct of 2005 provides for the elimination of the obligation imposed on certain utilities to purchase power from QFs at an avoided cost rate under certain conditions. However, the purchase obligation is only eliminated if FERC first finds that a QF has non-discriminatory access to wholesale energy markets having certain characteristics (including nondiscriminatory transmission and interconnection services provided by a regional transmission entity in certain circumstances). Existing contacts entered into under PURPA are not expected to be impacted, however, certain of NRG’s QFs currently interconnect into markets that may meet the qualifications for elimination of the PURPA purchase requirement. If the obligation to purchase from some or all of NRG’s QFs is terminated, NRG will need to find alternative purchasers for the output of these QFs once their current contracts expire. Such alternative purchases will be at prevailing market rates, which may not be as favorable as the terms of our PURPA sales arrangements under existing contracts and thus may diminish the value of its QF’s. In addition, under FERC regulations implementing EPAct of 2005, QFs not making sales pursuant to state-approved avoided cost rates will become subject to FERC’s ratemaking authority under the FPA and be required to obtain market rate authority in order to be allowed to sell power at market-based rates.
Nuclear Regulatory Commission
      The NRC is authorized under the Atomic Energy Act of 1954, as amended, or the AEA, among other things, to grant licenses for, and regulate the operation of, commercial nuclear power reactors. As a holder of an ownership interest in STP, our subsidiary Texas Genco, LP is an NRC licensee and is subject to NRC regulation. This NRC license gives it the right only to possess an interest in STP but not to operate it. Operating authority under the NRC operating license for STP is held by STPNOC. NRC regulation involves licensing, inspection, enforcement, testing, evaluation and modification of all aspects of plant design and operation (including the right to order a plant shutdown), technical and financial qualifications, and decommissioning funding assurance in light of NRC safety and environmental requirements. In addition, NRC written approval is required prior to a licensee transferring an interest in its license, either directly or indirectly. As a possession-only licensee (i.e., non-operating co-owner), the NRC’s regulation of Texas Genco, LP primarily focuses on its ability to meet its financial and decommissioning funding assurance obligations. In connection with the acquisition by Texas Genco of a 30.8% interest in STP from CenterPoint Energy, the NRC required Texas Genco to enter into a support agreement with Texas Genco, LP to provide up to $120 million to Texas Genco, LP if necessary to support operations at STP. Texas Genco entered into that support agreement on April 13, 2005. The support agreement remains in effect now that the Acquisition has been consummated.
      Decommissioning Trusts. Upon expiration of the operating terms of the operation licenses for the two generating units at STP (currently scheduled for 2027 and 2028), the co-owners of STP are required under federal law to decontaminate and decommission STP. In May 2004, an outside consultant estimated a 44.0% share of the STP decommissioning costs to be approximately $650 million in 2004 dollars.

35


Table of Contents

      Under NRC regulations, a power reactor licensee generally must pre-fund the full amount of its estimated NRC decommissioning obligations unless it is a rate regulated utility (or a state or municipal entity that sets its own rates) or has the benefit of a state-mandated non-bypassable charge available to periodically fund the decommissioning trust such that periodic payments to the trust, plus allowable earnings, will equal the estimated decommissioning obligations needed by the time decommissioning is expected to begin. Currently, Texas Genco, LP’s funding against its decommissioning obligation is contained within two separate trusts. PUCT regulations provide for the periodic funding of our decommissioning obligations through non-bypassable charges collected by CenterPoint Energy Houston Electric, LLC and AEP Texas Central Company, or CenterPoint Houston and AEP TCC, from their customers.
      In the event that the funds from the trusts are ultimately determined to be inadequate to decommission the STP facilities, the original owners of our STP interests, CenterPoint Houston and AEP TCC, each will be required to collect, through their PUCT-authorized non-bypassable charges to customers, additional amounts required to fund the decommissioning obligations relating to our 44.0% share, provided that we have complied with the PUCT’s rules and regulations regarding decommissioning trusts. Following the completion of the decommissioning, if surplus funds remain in the decommissioning trusts, any excess will be refunded to the respective rate payers of CenterPoint Houston or AEP TCC (or their successors).
Public Utility Commission of Texas
      Our Texas subsidiaries are registered as power generation companies with PUCT. PUCT also has jurisdiction over power generation companies with regard to the administration of nuclear decommissioning trusts, PUCT state-mandated capacity auctions and the implementation of measures to mitigate undue market power that a power generation company may have and to remedy market power abuses in the ERCOT market and, indirectly, through oversight of ERCOT.
Regulatory Developments
      In New England, New York, the Mid-Atlantic region, the Midwest and California, FERC has approved regional transmission organizations, also commonly referred to as independent system operators, or ISOs. Most of these ISOs administer a wholesale centralized bid-based spot market in their regions pursuant to tariffs approved by FERC and associated ISO market rules. These tariffs/market rules dictate how the day ahead and real-time markets operate, how market participants may make bilateral sales to one another, and how entities with market-based rates shall be compensated within those markets. The ISOs in these regions also control access to and the operation of the transmission grid within their regions. In Texas, pursuant to a 1999 restructuring statute, the PUCT has granted similar responsibilities to ERCOT.
      We are affected by rule/tariff changes that occur in the existing ISOs. The ISOs that oversee most of the wholesale power markets have in the past imposed, and may in the future continue to impose, price limitations and other mechanisms (in particular, market power mitigation rules) to address some of the volatility in these markets. These types of price limitations and other regulatory mechanisms may adversely affect the profitability of our generation facilities that sell energy into the wholesale power markets. In addition, new approaches to the sale of electric power, in particular capacity, have been proposed, and it is not yet clear how they will operate in times of market stress or whether they will provide adequate compensation to generators over the long term.
Regional Businesses — Market Developments
Texas (ERCOT) Region
Texas Nodal Protocols
      At the direction of the PUCT, the ERCOT stakeholder process has developed the “Texas Nodal Protocols” that sets forth a complete and detailed revised wholesale market design based on locational marginal pricing (in place of the current ERCOT zonal market today). The stakeholder process took two years to complete and incorporates a variety of unique characteristics for a nodal market as the result of

36


Table of Contents

accommodations reached by parties in the stakeholder process. Major elements include bilateral energy and ancillary schedules, day-ahead energy market, resource specific energy and ancillary service bid curves, direct assignment of all congestion rents, nodal energy prices for generators, aggregation of nodal to zonal energy prices for loads, congestion revenue rights (including pre-assignment for public power entities), and pricing safeguards. The PUCT will consider approval of the Texas Nodal Protocols by early 2006 and has indicated January 1, 2009, as the date for full implementation of the new market design. Under the expedited schedule, the evidentiary hearing concluded December 13, 2005, and briefing by parties concluded January 27, 2006.
      For a detailed discussion on market developments for the Northeast, South Central, Western and Other regions, please see Item 15 — Note 26 to the Consolidated Financial Statements.
Environmental Matters
      We are subject to a broad range of environmental and safety laws and regulations (across a broad number of jurisdictions) in the development, ownership, construction and operation of domestic and international projects. These laws and regulations generally require that governmental permits and approvals be obtained before construction or during operation of power plants. Environmental laws have become increasingly stringent over time, particularly the regulation of air emissions from power generators. Such laws generally require regular capital expenditures for power plant upgrades, modifications and the installation of certain pollution control equipment. It is not possible at this time to determine when or to what extent additional facilities, or modifications to existing or planned NRG facilities, will be required due to potential changes to environmental and safety laws and regulations, regulatory interpretations or enforcement policies. In general, future laws and regulations are expected to require the addition of emissions control or other environmental quality equipment or the imposition of certain restrictions on the operations of the combined company. We expect that future liability under, or compliance with, environmental requirements could have a material effect on our operations or competitive position.
U.S. Federal Environmental Initiatives
Air
      On May 18, 2005, the US Environmental Protection Authority, or USEPA, published the Clean Air Mercury Rule, or CAMR, to permanently cap and reduce mercury emissions from coal-fired power plants. CAMR imposes limits on mercury emissions from new and existing coal-fired plants and creates a market-based cap-and-trade program that will reduce nationwide utility emissions of mercury in two phases (2010 and 2018). Consistent with the significant debate on whether the USEPA has authority to regulate mercury emissions through a cap-and-trade mechanism (as opposed to a command-and-control requirement to install “maximum achievable control technology”, or MACT, on a unit basis), 14 states, together with five environmental organizations, have filed petitions for reconsideration of CAMR. The states (including California, Connecticut, Delaware, Illinois, Maine, Massachusetts, New Hampshire, New Jersey, New Mexico, New York, Pennsylvania, Rhode Island, Vermont and Wisconsin) allege that the rule violates the Clean Air Act, or CAA, because it fails to treat mercury as a hazardous air pollutant. On August 4, 2005, the U.S. Court of Appeals for the District of Columbia Circuit denied the environmental petitioners’ request for a stay of CAMR. On October 28, 2005, the USEPA published notices of reconsideration of seven specific aspects of CAMR (including state allocations). Each of our coal-fired electric power plants will be subject to mercury regulation. However, since the rule has yet to be implemented by individual states and given the USEPA’s pending reconsideration of the rule, it is difficult to assess with certainty how CAMR will affect our operations. Nevertheless, we continue to actively review emerging mercury monitoring and mitigation strategies and technologies to identify the most cost-effective options for NRG in implementing required mercury emission controls on the stipulated schedule.
      On May 12, 2005, the USEPA published the Clean Air Interstate Rule, or CAIR. This rule applies to 28 Eastern States and the District of Columbia and caps SO2 and NOX emissions from power plants in two phases (2010 and 2015 for SO2 and 2009 and 2015 for NOX). CAIR will apply to certain of the combined company’s power plants in New York, Massachusetts, Connecticut, Delaware, Louisiana, Illinois, Penn-

37


Table of Contents

sylvania, Maryland and Texas. States must achieve the required emission reductions through: (a) requiring power plants to participate in a USEPA-administered interstate cap-and-trade system; or (b) measures to be selected by individual states. On August 24, 2005, the USEPA published a proposed Federal Implementation Plan, or FIP, to ensure that generators affected by CAIR reduce emissions on schedule. In addition, on December 20, 2005, the USEPA signed proposed revisions to the National Ambient Air Quality Standards (“NAAQS”) for fine particulates (PM2.5) and inhalable coarse particulates (PM10-PM2.5), that would require affected states to implement further rules to address SO2 and NOX emissions (as precursors of fine particulates in the atmosphere). Further, on November 22, 2005, the USEPA granted requests to reconsider four specific aspects of CAIR (including the inclusion of certain states) with final action on reconsideration expected by March 15, 2006. While our current business plans include initiatives to address emissions (for example, the conversion of Huntley and Dunkirk to burn low sulfur coal), until the final CAIR rule and NAAQS for PM2.5, PM10-2.5 and ozone are actually implemented by specific state legislation, it is not possible to identify with greater specificity the effect of CAIR on us. As noted below, certain states in which we operate have already announced plans to implement emissions reductions that go beyond the CAIR requirements. It is possible that investments in additional backend control technologies will be required and we continue to evaluate these issues.
      Although we recognize the uncertainties regarding how CAMR and CAIR will be implemented, we expect to incur a substantial increase in our environmental capital expenditures between 2009 and 2012 in order to ensure compliance with CAMR and CAIR. We have currently estimated expenditures of around $540 million for CAMR and CAIR compliance during this period for the NRG facilities most of which would be incurred at our various coal-fired plants in the Northeast region and South Central region. We have currently estimated our total capital expenditures for compliance with air pollution control regulations from 2006 to 2014 at the NRG facilities at approximately $675 million.
      From 1999 through 2005, Texas Genco invested approximately $700 million for NOX emissions controls at its plants. These emissions controls were installed to comply with regulations adopted by the Texas Commission on Environmental Quality, or TCEQ, to attain the one-hour NAAQS for ozone, as well as provisions of the Texas electric restructuring law. As a result, emissions from our plants in the Houston-Galveston area have been reduced by approximately 88% from 1998 levels and our Texas fleet overall operates at one of the lowest NOX emissions rates in the country. In aggregate, our Texas plants are in compliance with current NOX emission limits and are not expected to incur material environmental capital expenditures to ensure NOX emissions compliance in the next several years. The TCEQ has, however, initiated a rulemaking process for establishing lower NOX emissions limits to assure compliance with the USEPA 8-hour ozone standard in the Houston-Galveston and Dallas-Fort Worth areas. It is possible that any new regulations implemented may require additional NOX emission controls on the Texas plants in 2009 or beyond. We have currently estimated approximately $70 million in additional capital expenditures with respect to compliance with air pollution control requirements (primarily replacement of catalyst for NOX emission controls) between 2006 and 2014.
      The USEPA had also proposed MACT standards for nickel from oil-fired units that would essentially require the installation of electrostatic precipitators on certain oil-fired units. These proposed requirements were originally included in drafts of CAMR. However, reflecting further dialogue with generation industry participants and additional scientific review, the nickel MACT provisions were omitted from CAMR. In fact, the USEPA issued a delisting rule on March 29, 2005 effectively removing the MACT standards for nickel (i.e., specific control technologies to be installed at each affected plant) at oil-fired power plants. A number of environmental groups lodged legal challenges to the USEPA’s delisting rule and the agency has agreed to reconsider this delisting, although it has not specified which issues will be reconsidered. As the delisting challenge relates to both nickel from oil-fired power plants and mercury from coal-fired plants, it is not possible to predict the outcome of the pending legal action.
      NRG’s facilities in the eastern United States are subject to a cap-and-trade program governing NOX emissions during the “ozone season” (May 1 through September 30). These rules essentially require that one NOX allowance be held for each ton of NOX emitted from fossil fuel-fired stationary boilers, combustion turbines, or combined cycle systems. Each of NRG’s facilities that is subject to these rules has been allocated

38


Table of Contents

NOX emissions allowances. NRG currently estimates that the portfolio total is currently sufficient to generally cover operations at these facilities through 2009. However, if at any point allowances are insufficient for the anticipated operation of each of these facilities, NRG must purchase NOX allowances. Any obligation to purchase a substantial number of additional NOX allowances could have a material adverse effect on NRG’s operations.
      The Clean Air Visibility Rule (or so-called BART rule) was published by the USEPA on July 6, 2005. This rule is designed to improve air quality in national parks and wilderness areas. The rule requires regional haze controls (by targeting SO2 and NOX emissions from sources including power plants of a certain vintage) through the installation of Best Available Retrofit Technology, or BART, in certain cases. States must develop implementation plans by December 2007 which may be satisfied through an emissions trading program for BART sources. Although the BART rule will apply to many of the Company’s facilities, sources that are also subject to CAIR (which include most of our facilities) will likely be able to satisfy their obligations under the BART rule through compliance with the more stringent CAIR. Accordingly, no material additional expenditures are anticipated for compliance with the Clean Air Visibility Rule, beyond those required by CAIR.
      In addition to federal regulation, national legislation has been proposed that would impose annual caps on U.S. power plant emissions of NOX, SO2, mercury, and, in some instances, CO2. While the Administration’s proposed Clear Skies Act (which would regulate the aforementioned pollutants except for CO2) stalled in Senate Committee on March 9, 2005, the Bush Administration continues to support this legislation. Clear Skies overlaps significantly with CAIR and CAMR, and would likely modify or supersede those rules if enacted as federal legislation as proposed.
      Twelve states and various environmental groups filed suit against the USEPA seeking confirmation that the USEPA has an existing obligation to regulate greenhouse gases, or GHGs, under the CAA. On July 15, 2005, the US Court of Appeals for the District of Columbia Circuit (in Commonwealth of Massachusetts v. EPA) supported the USEPA’s refusal to regulate GHG emissions from motor vehicles, although avoiding the broader issue of whether USEPA has authority, or an obligation, to regulate GHGs under the CAA. On September 1, 2005, five states requested reconsideration of this dismissal. While the specific issue under consideration is the USEPA’s obligation to require GHG cuts from mobile sources, any decision implying that the USEPA has an obligation to regulate GHGs nationally has wider implications for the power generation sector. In 2004, eight states and the City of New York filed suit in the U.S. District Court for the Southern District of New York against American Electric Power Company, Southern Company, Tennessee Valley Authority, Xcel Energy, Inc. and Cinergy Corporation, alleged to be the nation’s five largest emitters of GHGs and all of which are owners of electric generation (Connecticut v. AEP). An injunction was sought against each defendant to force it to abate its contribution to the “global warming nuisance” by requiring CO2 emissions caps and annual reductions in those caps for at least a decade. On September 15, 2005, the public nuisance case was dismissed on the basis that the claims made raised “political questions” reserved to the legislative and executive branches of the federal government. On September 20, 2005, plaintiffs filed an appeal of this decision with the US Court of Appeals for the Second Circuit. The initiation of GHG-related litigation and proposed legislation is becoming more frequent, although the outcomes of such suits or proposed litigation cannot be predicted. Although NRG has not been named as a defendant in any related suits to date, the outcome of such suits could affect the overall regulation of GHGs under the CAA. Our compliance costs with any mandated GHG reductions in the future could be material. See also “Regional U.S. Environmental Regulatory Initiatives,” below.
      In the 1990s, the USEPA commenced an industry-wide investigation of coal-fired electric generators to determine compliance with environmental requirements under the CAA associated with repairs, maintenance, modifications and operational changes made to facilities over the years. As a result, the USEPA and several states filed suits against a number of coal-fired power plants in mid-western and southern states alleging violations of the CAA NSR/ Prevention of Significant Deterioration, or PSD, requirements. In one of the more prominent suits of this type, involving Ohio Edison, a subsidiary of First Energy, the USEPA reached settlement on March 18, 2005 for NSR issues with respect to all coal-fired plant located in Ohio, obligating First Energy to spend $1.1 billion to install pollution control equipment through 2010. In another similar suit,

39


Table of Contents

on June 15, 2005 the USEPA appeal in the Duke Energy case was heard with the U.S. Court of Appeals for the Fourth Circuit holding in favor of Duke’s position as to what type of modification triggers NSR and PSD provisions. Rehearing petitions filed in this matter by the Department of Justice and some environmental groups were denied on August 30, 2005. On December 28, 2005, further petitions were filed by environmental groups requesting Supreme Court review of this decision. On June 3, 2005, the U.S. District Court for the Northern District of Alabama reached conclusions favorable to Alabama Power through the court’s interpretation of NSR rules relating to “routine maintenance, repair and replacement,” or RMRR, and the correct test for determining a significant net emissions increase. However, divergent rulings exist on NSR issues across the country, with courts in Ohio and Indiana providing interpretations of the NSR provisions different from those in the Duke and Alabama cases. For example, on August 29, 2005, U.S. District Court for the Southern District of Indiana ruled in U.S. v. Cinergy in favor of the USEPA and specifically rejected the conclusion in the Duke case.
      In an effort to revise the legal requirements as to what amounts to a major modification and what emissions tests apply, USEPA issued its NSR Reform Rule on December 31, 2002, although its implementation was stayed by court order on December 24, 2003. There have been a number of legal challenges to different aspects of the proposed rule. On October 13, 2005 USEPA proposed changes to its NSR permitting program to stipulate an emissions test standard based on hourly emission rates, rather than aggregate annual emissions.
      Given the divergent cases and rules in this area (at both the federal and state levels), it is difficult to predict with certainty the parameters of the final NSR/ PSD regime. However, in October 2005, the USEPA announced that due to the promulgation of programs such as CAIR and the Clean Air Visibility Rule, it is placing a lower priority on continued enforcement of suspected NSR/ PSD violations. In the meantime, we continue to analyze all proposed projects at our facilities to ensure ongoing compliance with the applicable legal requirements.
Water
      In July 2004, USEPA published rules governing cooling water intake structures at existing power facilities (the Phase II 316(b) Rules). The Phase II 316(b) Rules specify certain location, design, construction and capacity standards for cooling water intake structures at existing power plants using the largest amounts of cooling water. These rules will require implementation of the Best Technology Available, or BTA, for minimizing adverse environmental impacts unless a facility shows that such standards would result in very high costs or little environmental benefit. The Phase II 316(b) Rules require our facilities that withdraw water in amounts greater than 50 million gallons per day (and utilize at least 25% for cooling purposes) to submit certain surveys, plans and operational and restoration measures (with wastewater permit applications or renewal applications) that would minimize certain adverse environmental impacts of impingement or entrainment. The Phase II 316(b) Rules affect a number of NRG’s plants, specifically those with once-through cooling systems. Compliance options include the addition of control technology, modified operations, restoration or a combination of these, and are subject to a comparative cost and cost/benefit justification. While NRG has conducted a number of the requisite studies, until all the needed studies throughout our fleet have been completed and consultations on the results have occurred with USEPA (or its delegated state or regional agencies), it is not possible to estimate with certainty the capital costs that will be required for compliance with the Phase II 316(b) Rules, although current estimates for the combined company’s facilities involve capital expenditures and related costs of around $80 million between 2006 and 2012. In addition, the Phase II Rules have been challenged by industrial and environmental groups and the outcome of this litigation could affect our obligations pursuant to these rules. Further, Phase III rules, which were proposed in November 2004, may be applicable to some of our smaller power plants when finalized.
Nuclear Waste
      Under the U.S. Nuclear Waste Policy Act of 1982, the federal government must remove and ultimately dispose of spent nuclear fuel and high-level radioactive waste from nuclear plants such as STP. Consistent with the Act, owners of nuclear plants, including NRG and the other owners of STP, entered into contracts

40


Table of Contents

setting out the obligations of the owners and the U.S. Department of Energy, or DOE, including the fees being paid by the owners for DOE’s services. Since 1998, the DOE has been in default on its obligations to begin removing spent nuclear fuel and high-level radioactive waste from reactors. On January 28, 2004, Texas Genco LP and the other owners of STP filed a breach of contract suit against the DOE in order to protect against the running of a statute of limitations.
      Under the federal Low-Level Radioactive Waste Policy Act of 1980, as amended, the state of Texas is required to provide, either on its own or jointly with other states in a compact, for the disposal of all low-level radioactive waste generated within the state. The state of Texas has agreed to a compact with the states of Maine and Vermont for a disposal facility that would be located in Texas. That compact was ratified by Congress and signed by President Clinton in 1998. In 2003, the state of Texas enacted legislation allowing a private entity to be licensed to accept low-level radioactive waste for disposal. We intend to continue to ship low-level waste material from STP off-site for as long as an alternative disposal site is available. Should existing off-site disposal become unavailable, the low-level waste material will then be stored on-site. STP’s on-site storage capacity is expected to be adequate for STP’s needs until other off-site facilities become available.
Regional U.S. Environmental Regulatory Initiatives
      Texas (ERCOT) Region. The USEPA’s Region VI (which includes Texas, Louisiana, and three other states) indicated in September 2004 that it intends to evaluate 75%-80% of the coal-fired power plants in its region over the next several years for potential violations of the NSR program or PSD. During air emissions inspections of the Limestone plant in November 2004, a USEPA inspector informally advised Texas Genco that the USEPA has drafted, but not yet sent, an information request letter pursuant to Section 114 of the CAA concerning potential NSR or PSD issues at the Limestone plant. As of March 3, 2006, NRG has not received this letter and has not had any further communications on this issue with the USEPA.
      Northeast Region. Massachusetts air regulations prescribe schedules under which six existing coal-fired power plants in-state are required to meet stringent emission limits for NOX, SO2, mercury, and CO2. The state has reserved the issue of control of carbon monoxide and particulate matter emissions for future consideration. Our Somerset plant is subject to these regulations. NRG has installed natural gas re-burn technology to meet the NOX and SO2 limits. On June 4, 2004, the Massachusetts Department of Environmental Protection, or MADEP, issued its regulation on the control of mercury emissions. The effect of this regulation is that starting October 1, 2006, Somerset will be capped at 13.1 lbs/year of mercury and as of January 1, 2008, Somerset must achieve a reduction in its mercury inlet-to-outlet concentration of 85%. We plan to meet the requirements through the management of our fuels and the use of early and off-site reduction credits. Additionally, NRG has entered into an agreement with MADEP to retire or repower the Somerset station by the end of 2009.
      The Massachusetts carbon regulation 310 CMR 7.29 “Emissions Standards for Power Plants” requires coal-fired generation located within the state to comply with CO2 emission restrictions. A carbon emissions cap applies beginning January 1, 2006, while a rate requirement will apply in 2008. This regulation means that if CO2 emissions at our Somerset facility exceed the annual cap from 2006, then the excess must be offset with approved CO2 credits. However, since there are currently no approved CO2 credits for use in Massachusetts, MADEP has proposed that generators annually report overages, starting in 2006, and at the time that there is a an established CO2 market operating in the state, NRG would be required to purchase or generate sufficient CO2 credits to offset the balance. On December 20, 2005, Massachusetts issued proposed revisions to the CO2 regulations, including a proposed implementing regime that could allow the use of on-site and off-site generated CO2 credits, with a price backstop of $10/ton. MADEP expects to finalize these revisions in spring 2006. Massachusetts was involved in the initial negotiations regarding the Regional Greenhouse Gas Initiative, or RGGI, which is discussed below, but did not enter into the Memorandum of Understanding with other northeastern states. Given the regulatory uncertainty surrounding implementation of Massachusetts’s carbon market and the corresponding costs of CO2 allowances when that market exists, Somerset could be materially affected if it does not retire by the end of 2009.

41


Table of Contents

      Pursuant to New York State Department of Environmental Conservation, or NYSDEC, rules (the Acid Deposition Reduction Program, ADRP) fossil-fuel-fired combustion units in New York must reduce SO2 emissions to 25% below the levels allowed in the federal Acid Rain Program starting January 2005 and to 50% below those levels starting in January 2008. In addition, under ADRP generators now also have to meet the ozone season NOX emissions limit year-round. Our strategy for complying with the ADRP involves the generation of early reductions of SO2and NOX emissions associated with fuel switching and use such reductions to extend the timeframe for implementing technological controls, which could ultimately include the addition of flue gas desulfurization, or FGD, and selective catalytic reduction, or SCR, equipment. On January 11, 2005, NRG reached an agreement with the State of New York and the NYSDEC in connection with emissions reductions at the Huntley and Dunkirk facilities, as discussed below in Legal Proceedings. The Consent Decree was entered by the U.S. District Court for the Western District of New York on June 3, 2005. NRG does not anticipate that any additional material capital expenditures, beyond those already spent, will be required for our Huntley and Dunkirk plants to meet the current compliance standards under the Consent Decree through 2010, although, this does not reflect any additional capital expenditures that may be required to satisfy other federal and state laws.
      Huntley Power LLC, Dunkirk Power LLC and Oswego Power LLC entered into a Consent Order with NYSDEC, effective March 31, 2004, regarding certain alleged opacity exceedances. The Consent Order required the respondents to pay a civil penalty of $1.0 million which was paid in April 2004. The Order also stipulates penalties (payable quarterly) for future violations of opacity requirements and a compliance schedule. NRG recently resolved a dispute with NYSDEC over the method of calculation for stipulated penalties. NRG paid NYSDEC $1.1 million at the end of 2005 to cover the stipulated penalty payments that had been withheld pending resolution of the dispute.
      While no rules affecting NRG’s existing facilities have been formally proposed, Delaware has recently issued a “Start Action Notice” to impose emissions standards for SO2, NOX and mercury. Delaware is pursuing such rule-making based on recent determinations that portions of the state are in non-attainment for NAAQS for fine particulates, and all of the state is in non-attainment for the NAAQS for 8-Hour Ozone. We are evaluating emissions reduction opportunities which may include blending low sulfur western coals. NRG is actively participating in the Delaware rule-making as a stakeholder and will continue to be involved in environmental policy-making efforts in Delaware through the Governor’s Energy Task Force and interactions with legislators, the PSC and the Delaware Department of Natural Resources and Environmental Control, or DNREC.
      The Ozone Transport Commission, or OTC, was established by Congress and governs ozone and the NOX budget program in certain eastern states, including Massachusetts, Connecticut, New York and Delaware. In January 2005, the OTC redoubled its efforts to develop a multi-pollutant regime (SO2, NOX , mercury and CO2) that is expected to be completed by mid-2006 (with individual state implementation to follow). On June 8, 2005, the OTC members unanimously resolved to implement “CAIR-Plus” emissions regulations, based on concerns that the USEPA’s CAIR fails to achieve attainment of 8-hour ozone and fine particulate matter. As a result, the OTC proposes to implement a regional plan containing emissions reduction targets for power plants that exceed those under CAIR. The OTC targets and timelines are as follows: (a) through September 2006: write model rule, with participating states signing a Memorandum of Understanding; (b) by December 2006 states file their implementation plans or reduction regulations; (c) 2008 Phase I reductions of NOX (to 1.87 million tons) and SO2 (to 3.0 million tons) apply; (d) 2012 Phase II reductions of NOX (to 1.28 million tons) and SO2 (to 2.0 million tons) apply; and (e) 2015 90% mercury removal required. OTC’s proposed CAIR-Plus involves emissions reductions which are both sooner and more aggressive than CAIR (e.g., aggregate NOX reductions would be 25% greater than CAIR, while SO2 reductions would be 33% greater than CAIR). NRG continues to be engaged in the OTC stakeholder process. While it is not possible to predict the outcome of this regional legislative effort, to the extent that the OTC is successful in implementing emissions requirements that are more stringent than existing regimes (including the recently reached New York settlement), NRG could be materially impacted.
      On December 20, 2005, seven northeastern states entered into a Memorandum of Understanding to create a regional initiative to establish a cap-and-trade GHG program for electric generators, referred to as the

42


Table of Contents

Regional Greenhouse Gas Initiative, or RGGI. The model RGGI rule is scheduled to be announced within the next few months, with an estimate of two to three years for participating states to finalize implementing regulations. The current proposal is for the program to start in 2009, with a review in 2015 and an assessment of further reductions after 2020. The proposal involves an overall RGGI cap (with state sub-caps) based on CO2 emissions for the period 2000 to 2004. That cap, referred to as “stabilization,” will remain the same through 2015, with a 10% reduction between 2015 and 2020. Decisions on allowance allocations will be made by each state, although at least 25% of the state allocations will be set aside for public purposes, suggesting that from implementation, generators in the RGGI region may receive an allocation of allowances that is materially less than required to cover existing emissions, potentially having a significant effect on the cost of operations. While the details of the model rule are still under development, when RGGI is implemented, our plants in New York, Delaware and Connecticut may be materially affected. If Massachusetts, which was originally involved in the development of RGGI, decides to participate, NRG’s plant in that state may also be affected.
      South Central Region. The Louisiana Department of Environmental Quality, or LADEQ, has promulgated State Implementation Plan revisions to bring the Baton Rouge ozone non-attainment area into compliance with applicable NAAQS. NRG participated in development of the revisions, which require the reduction of NOX emissions at the gas-fired Big Cajun I Power Station and coal-fired Big Cajun II Power Station to 0.1 lbs/ MMBtu and 0.21 lbs/ MMBtu NOX, respectively (both based on heat input). This revision of the Louisiana air rules would constitute a change-in-law covered by agreement between Louisiana Generating, LLC and the electric cooperatives (power off-takers), allowing nearly all of the costs of added combustion controls to be passed through to the cooperatives. The combustion controls required at the Big Cajun II Generating Station to meet the state’s NOX regulations have been installed.
      On January 27, 2004, Louisiana Generating, LLC and Big Cajun II received a request for information under Section 114 of the CAA from USEPA seeking information primarily related to physical changes made at Big Cajun II and subsequently received a notice of violation, or NOV, based on alleged NSR violations. See “— Legal Proceedings” for a discussion of this matter. NRG is up-to-date with all USEPA information requests it has received in connection with this matter and has not been contacted by USEPA pursuant to the NOV since May 2005.
      Western Region. The El Segundo Generating Station is regulated by the South Coast Air Quality Management District, or SCAQMD. Before its retirement as of January 1, 2005, the Long Beach Generating Station was also regulated by SCAQMD. SCAQMD approved amendments to its Regional Clean Air Incentives Market, or RECLAIM, NOX regulations on January 7, 2005. RECLAIM is a regional emission-trading program targeting NOX reductions to achieve state and federal ambient air quality standards for ozone. Among other changes, the amendments reduce the NOX RECLAIM Trading Credit, or RTC, holdings of El Segundo Power, LLC and Long Beach Generation LLC facilities by certain amounts. Notwithstanding these amendments, retained RTCs are expected to be sufficient to operate El Segundo Units 3 and 4 as high as 100% capacity factor for the life of those units.
      On October 6, 2005, the California Public Utilities Commission, or CPUC, adopted a policy statement on GHG Performance Standards as part of a focus on emissions from conventional fossil-fuel resources. The adopted policy statement directs the CPUC to investigate a GHG emissions performance standard for energy procurement by the state’s Investor-Owned Utilities, or IOUs, that is no higher than the GHG emissions levels of a combined-cycle natural gas turbine for all energy procurement contracts longer than three years in length and for all new IOU owned generation. On January 13, 2006, the CPUC issued a draft decision establishing a load-based GHG emission cap that will apply to IOUs. While the decision doesn’t establish specific caps, it does indicate a preference for using 1990 emissions as the preferred baseline year. The decision also restricts IOUs from entering into power purchase agreements with generators unless the generator reports its GHG emissions through the California Climate Action Registry. West Coast Power is a member of the Registry and will be finalizing its 2004 GHG inventory by the end of February 2006. The CPUC is obligated to evaluate and decide on the details of the GHG cap and trading program under the recent draft decision by, ,as part of either an existing or new CPUC rulemaking sometime in 2006.

43


Table of Contents

      On February 9, 2006, the California State Lands Commission (“CSLC”) postponed an agenda item regarding, “Commission consideration of a resolution supporting the elimination of once through cooling in California power generation facilities.” The draft resolution urges the California State Water Resource Control Board and the California Energy Commission to develop policies that eliminate once through cooling systems at new and existing power plants in California. The draft resolution also requires that the CSLC not approve new or extended leases for power plants utilizing once through cooling systems after 2020. This resolution, if adopted, would affect the long term operation of the once through cooling systems at the El Segundo and Encina power stations as both systems rely on submerged land leases with the CSLC and both of which are currently undergoing lease renewals. Under pressure from power and desalination water industry groups, the CSLC agreed to postpone the agenda item until the April 27, 2006 Commission meeting in order to better understand the costs and impacts associated with the decision.
Domestic Site Remediation Matters
      Under certain federal, state and local environmental laws and regulations, a current or previous owner or operator of any facility, including an electric generating facility, may be required to investigate and remediate releases or threatened releases of hazardous or toxic substances or petroleum products at the facility. We may also be held liable to a governmental entity or to third parties for property damage, personal injury and investigation and remediation costs incurred by a party in connection with hazardous material releases or threatened releases. These laws, including the Comprehensive Environmental Response, Compensation and Liability Act of 1980, or CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, or SARA, impose liability without regard to whether the owner knew of or caused the presence of the hazardous substances, and courts have interpreted liability under such laws to be strict (without fault) and joint and several. The cost of investigation, remediation or removal of any hazardous or toxic substances or petroleum products could be substantial. Cleanup obligations can often be triggered during the closure or decommissioning of a facility, in addition to spills or other occurrences during our operations.
      On January 18, 2005, NRG Indian River Operations, Inc. received a letter of informal notification from DNREC stating that it may be a potentially responsible party with respect to the Burton Island Landfill, along with Delmarva Power. The letter signals only that an investigation is to be commenced and is not a conclusive determination. Further, the Burton Island Landfill is a site that would potentially qualify for a remedy under a “Voluntary Cleanup Program” or VCP. We have signaled our interest in being considered for a VCP should matters progress. With the exception of the foregoing, neither NRG nor Texas Genco have been named as a potentially responsible party with respect to any off-site waste disposal matter.
      Texas (ERCOT) Region. The lignite used to fuel the Limestone facility is obtained from a surface mine adjacent to the facility under an amended long-term contract with Texas Westmoreland Coal Co., or TWCC, entered into in August 1999. TWCC is responsible for performing ongoing reclamation activities at the mine until all lignite reserves have been produced. When production is completed at the mine, Texas Genco is responsible for final mine reclamation obligations. The Railroad Commission of Texas has imposed a bond obligation of approximately $70 million on TWCC for the reclamation of this lignite mine. Final reclamation activity is expected to commence in 2015. Pursuant to the contract with TWCC, an affiliate of CenterPoint Energy, Inc. has guaranteed $50 million of this obligation until 2010. The remaining sum of approximately $20 million has been bonded by the mine operator, TWCC. Under the terms of Texas Genco’s agreement, Texas Genco is required to post a corporate guarantee in the amount of $50 million of TWCC’s reclamation bond when CenterPoint’s obligation lapses. As of December 31, 2005, Texas Genco had accrued approximately $17 million related to the mine reclamation obligation.
      Further details regarding our Domestic Site Remediation obligations for the Northeast, South Central and Western regions can be found at Item 15 — Note 27 to the Consolidated Financial Statements.
International Environmental Matters
      Most of the foreign countries in which NRG owns or may acquire or develop independent power projects have environmental and safety laws or regulations relating to the ownership or operation of electric power

44


Table of Contents

generation facilities. These laws and regulations, like those in the U.S., are constantly evolving and have a significant impact on international wholesale power producers. In particular, NRG’s international power generation facilities will likely be affected by emissions limitations and operational requirements imposed by the Kyoto Protocol, which is an international treaty related to greenhouse gas emissions which entered into force on February 16, 2005, and country-based restrictions pertaining to global climate change concerns.
      We retain appropriate advisors in foreign countries and seek to design our international asset management strategy to comply with each country’s environmental and safety laws and regulations. There can be no assurance that changes in such laws or regulations will not adversely effect our international operations.
      Australia. With respect to Australia, climate change is considered a long-term issue (e.g. 2010 and beyond) and the Australian government’s response to date has included a number of initiatives, all of which have had no or minimal impact on our operations. The Australian government has stated that Australia will achieve its Kyoto Protocol target of 8% below 1990 greenhouse gas emission levels for the 2008 to 2012 reporting period, but that Australia will not ratify the Kyoto Protocol. Each Australian state government is considering implementing a number of climate change initiatives that will vary considerably state to state, with the possible exception of an inter-jurisdictional state-led carbon trading proposal (which is not supported by the federal government).
      NRG Flinders disposes of ash to slurry ponds at Port Augusta in South Australia. At the end of life of the power station, NRG Flinders will have an obligation to remediate these ponds in accordance with a plan accepted by the South Australian Environment Protection Agency and confirmed in the Environment Compliance Agreement between the South Australian Minister for Environment and Heritage and NRG Flinders dated September 20, 2000, or the EC Agreement. The estimated cost of remediation including contingencies according to the plan is AUD 2.0 million (approximately $1.5 million). There is no timeline associated with the obligation, but the EC Agreement extends to 2025. Under these arrangements, required remediation relates to surface remediation and does not entail any groundwater remediation.
      MIBRAG/ Schkopau, Germany. While CO2 emissions trading began in Germany in 2005, pursuant to European Union obligations under the Kyoto Protocol, we do not currently expect the CO2 trading program to be a material constraint on our business in Germany. Changes to the German Emission Control Directive will result in lower NOX emission limits for plants firing conventional fuels (Section 13 of the Directive) and co-firing waste products (Section 17 of the Directive). The new regulations will require the Mumsdorf and Deuben Power stations to install additional controls to reduce NOX emissions in 2006. These plant modifications are proceeding on schedule.
      The European Union’s Groundwater Directive and Mine Wastewater Management Directive are in the rule-making stage with the final outcome still under debate. Given the uncertainty regarding the possible outcome of the debate on these directives, we cannot quantify at this time the effect such requirements would have on our future coal mining operations in Germany.
      A new law specifically dealing with the relocation of the residents of Heuersdorf from the path of the mining plan was enacted by the legislature of Saxony in 2004. On November 25, 2005, the Saxony Constitutional Court upheld the constitutionality of the Heuersdorf act. This ruling cannot be appealed. Nuisance suits remain a possibility, but the court’s ruling brings the matter closer to final resolution.
      The supply contracts under which MIBRAG mines lignite from the Profen mine expire on December 31, 2021. The contracts under which MIBRAG mines lignite from the Schleenhain mine expire in 2041. At the end of each mine’s productive lifetime, MIBRAG will be required to reclaim certain areas. MIBRAG accrues for these eventual expenses and estimates the cost of the final reclamation to approach approximately 176 million in the instance of the Schleenhain mine and 132 million for Profen.

45


Table of Contents

Insurance
General
      NRG carries insurance coverage consistent with companies engaged in similar commercial operations with similar properties, including business interruption insurance for the coal and lignite plants. However, NRG’s insurance policies are subject to certain limits and deductibles as well as policy exclusions. Adequate insurance coverage in the future may be more expensive or may not be available on commercially reasonable terms. Also, the insurance proceeds received for any loss of or any damage to any of our generation plants may not be sufficient to restore the loss or damage without negative impact on our financial condition, results of operations or cash flows.
      NRG believes that the insurance program that is presently in effect for NRG after its acquisition of Texas Genco is consistent with prudent industry practice.
Nuclear
      NRG and the other owners of STP maintain nuclear property and nuclear liability insurance coverage as required by law and periodically review available limits and coverage for additional protection. The owners of STP currently maintain $2.75 billion in property damage insurance coverage, which is above the legally required minimum. STPNOC currently carries accidental outage coverage with a 17 week deductible and a six week indemnity at a rate of $3.5 million per week. This coverage may not be available on commercially renewable terms or may be more expensive in the future and any proceeds from such insurance may not be sufficient to indemnify the owners of STP for their losses. NRG has also purchased additional accidental outage coverage for its ownership percentage in STP. This coverage will provide maximum weekly indemnity of $1.98 million for 52 weeks and $1.584 million per week for the next 104 weeks after the 17-week waiting period and six-week indemnity period have been met. These figures are per unit and if more than one unit experiences an outage from the same accident, the weekly indemnity is limited to 80% of the single unit recovery when both units are out of service.
      The Price-Anderson Act, as amended by the Energy Policy Act of 2005, requires owners of nuclear power plants in the U.S. to be collectively responsible for retrospective secondary insurance premiums for liability to the public arising from nuclear incidents resulting in claims in excess of the required primary insurance coverage amount of $300 million per reactor. For such claims in excess of $300 million per reactor, NRG and the other owners of STP are liable for any single incident, whether it occurs at STP or at another nuclear power plant not owned by it, up to a cap of $95.8 million per reactor in retrospective premiums for such incident but not to exceed $15 million per year in each case as adjusted for future inflation. These amounts are assessed per each licensed reactor. STP is a two reactor facility and our liability is capped at 44.0% of these amounts due to our 44.0% interest in STP. The Price-Anderson Act only covers nuclear liability associated with any accident in the course of operation of the nuclear reactor, transportation of nuclear fuel to the reactor site, in the storage of nuclear fuel and waste at the reactor site and the transportation of the spent nuclear fuel and nuclear waste from the nuclear reactor. All other non-nuclear liabilities are not covered. Any substantial retrospective premiums imposed under the Price-Anderson Act or losses not covered by insurance could have a material adverse effect on our financial condition, results of operations or cash flows.

46


Table of Contents

Item 1A — Risk Factors Related to NRG Energy, Inc.
Many of our power generation facilities operate, wholly or partially, without long-term power sale agreements.
      Many of our facilities operate as “merchant” facilities without long-term power sale agreements, and therefore are exposed to market fluctuations. Without the benefit of long-term power purchase agreements for certain assets, we cannot be sure that we will be able to sell any or all of the power generated by these facilities at commercially attractive rates or that these facilities will be able to operate profitably. This could lead to future impairments of our property, plant and equipment or to the closing of certain of our facilities resulting in economic losses and liabilities, which could have a material adverse effect on our results of operations, financial condition or cash flows.
Our financial performance may be impacted by future decreases in oil and natural gas prices, significant and unpredictable price fluctuations in the wholesale power markets and other market factors that are beyond our control.
      A significant percentage of the company’s domestic revenues is derived from baseload power plants that are fueled by coal. In many of the competitive markets where we operate, the price of power typically is set by marginal cost natural gas-fired and oil-fired power plants that currently have substantially higher variable costs than our solid fuel baseload power plants. The current pricing and cost environment allows our baseload coal generation assets to earn attractive operating margins compared to plants fueled by natural gas and oil. A decrease in oil and natural gas prices could be expected to result in a corresponding decrease in the market price of power but would generally not affect the cost of the solid fuels that we use. This could significantly reduce the operating margins of our baseload generation assets and materially and adversely impact our financial performance.
      We sell all or a portion of the energy, capacity and other products from many of our facilities to wholesale power markets, including energy markets operated by independent system operators, or ISOs, or regional transmission organizations, as well as wholesale purchasers. We are generally not entitled to traditional cost-based regulation, therefore we sell electric generation capacity, power and ancillary services to wholesale purchasers at prices determined by the market. As a result, we are not guaranteed any rate of return on our capital investments through mandated rates, and our revenues and results of operations depend upon current and forward market prices for power.
      Market prices for power, generation capacity and ancillary services tend to fluctuate substantially. Unlike most other commodities, electric power can only be stored on a very limited basis and generally must be produced concurrently with its use. As a result, power prices are subject to significant volatility from supply and demand imbalances, especially in the day-ahead and spot markets. Long-term and short-term power prices may also fluctuate substantially due to other factors outside of our control, including:
  •  increases and decreases in generation capacity in our markets, including the addition of new supplies of power from existing competitors or new market entrants as a result of the development of new generation plants, expansion of existing plants or additional transmission capacity;
 
  •  changes in power transmission or fuel transportation capacity constraints or inefficiencies;
 
  •  electric supply disruptions, including plant outages and transmission disruptions;
 
  •  weather conditions;
 
  •  changes in the demand for power or in patterns of power usage, including the potential development of demand-side management tools and practices;
 
  •  availability of competitively priced alternative power sources;
 
  •  development of new fuels and new technologies for the production of power;
 
  •  natural disasters, wars, embargoes, terrorist attacks and other catastrophic events;

47


Table of Contents

  •  regulations and actions of the ISOs; and
 
  •  federal and state power market and environmental regulation and legislation.
      These factors have caused our quarterly operating results to fluctuate in the past and will continue to cause them to do so in the future.
Our costs, results of operations, financial condition and cash flows could be adversely impacted by disruption of our fuel supplies.
      We rely on coal, oil and natural gas to fuel our power generation facilities. Delivery of these fuels to our facilities is dependent upon the continuing financial viability of contractual counterparties as well as upon the infrastructure (including rail lines, rail cars, barge facilities, roadways, and natural gas pipelines) available to serve each generation facility. As a result, we are subject to the risks of disruptions or curtailments in the production of power at our generation facilities if a counterparty fails to perform or if there is a disruption in the fuel delivery infrastructure.
      The company has sold forward a substantial part of its baseload power in order to lock in long-term prices that it deemed to be favorable at the time it entered into the forward sale contracts. In order to hedge our obligations under these forward power sales contracts, we have entered into long-term and short-term contracts for the purchase and delivery of fuel. Many of our forward power sales contracts do not allow us to pass through changes in fuel costs or discharge the company’s power sale obligations in the case of a disruption in fuel supply due to force majeure events or the default of a fuel supplier or transporter. Disruptions in our fuel supplies may therefore require us to find alternative fuel sources at higher costs, to find other sources of power to deliver to counterparties at higher cost, or to pay damages to counterparties for failure to deliver power as contracted. Any such event could have a material adverse effect on our financial performance.
      We also buy significant quantities of fuel on a short-term or spot market basis. Prices for all of our fuels fluctuate, sometimes rising or falling significantly over a short period. The price we can obtain for the sale of energy may not rise at the same rate, or may not rise at all, to match a rise in fuel or delivery costs. This may have a material adverse effect on our financial performance. Changes in market prices for natural gas, coal and oil may result from the following:
  •  weather conditions;
 
  •  seasonality;
 
  •  demand for energy commodities and general economic conditions;
 
  •  disruption of electricity, gas or coal transmission or transportation, infrastructure or other constraints or inefficiencies;
 
  •  additional generat